Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />11 <br /> <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br /> <br />No. <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />INGERSON NEIGHBORHOOD POND B CONSTRUCTION <br /> Unit <br />Item Unit Ouantitv Price Extension <br />Mobilization LS 1.0 $ 2,300.00 $ 2,300.00 <br />Clearing and Grubbing ACRE 0.2 $ 20,000.00 $ 3,000.00 <br />Bituminous Pavement Removal SF 1,500.0 $ 2.00 $ 3,000.00 <br />Miscellaneous Removals LS 1.0 $ 2,500.00 $ 2,500.00 <br />Seeding ACRE 0.5 $ 5,000.00 $ 2,500.00 <br />Sawing Bituminous Pavement LF 44.0 $ 2.00 $ 100.00 <br />Control Outlet EA 1.0 $ 5,000.00 $ 5,000.00 <br />Rip Rap CY 27.0 $ 53.50 $ 1,400.00 <br />Pond Excavation CY 2,704.0 $ 5.50 $ 14,900.00 <br />36" Pipe Apron EA 1.0 $ 2,000.00 $ 2,000.00 <br />36" RCP LF 120.0 $ 60.00 $ 7,200.00 <br /> <br />10% Contingency <br /> <br />$ 4,400.00 <br /> <br />SUBTOTAL <br />26% Indirect Cost and Capitalized Interest <br /> <br />$ 48,300.00 <br />$ 12,600.00 <br /> <br />Total Estimated Project Cost - Pond B Construction <br /> <br />$ 60,900.00 <br />