Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br /> <br />No. <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />HAMUNE FRONTAGE ROAD STORM SEWER CONSTRUCTION <br />(INGERSON ROAD TO TILLER LANE) <br />(BASED ON 32' F-F) <br /> <br /> Unit <br />Item Unit Ouantitv Price Extension <br />Mobilization LS 1.0 $ 600.00 $ 600.00 <br />Connect to Existing Storm Sewer EA 1.0 $ 1,500.00 $ 1,500.00 <br />36" RCP LF 36.0 $ 60.00 $ 2,200.00 <br />Manhole (60") EA 1.0 $ 3,000.00 $ 3,000.00 <br />Catch Basin (2' x 3') EA 2.0 $ 1,200.00 $ 2,400.00 <br />12" RCP LF 43.0 $ 25.00 $ 1,100.00 <br /> <br />10% Contingency <br /> <br />$ 1,100.00 <br /> <br />SUBTOTAL <br />26% Indirect Cost and Capitalized Interest <br /> <br />$ 11,900.00 <br />$ 3,100.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ 15,000.00 <br />