Laserfiche WebLink
<br /> <br /> <br />FIVE-YEAR CAPITAL IMPROVEMENT PLAN <br /> <br />DEPARTMENT <br />Public Works <br /> <br />PROJECT NUMBER <br />482-00+ <br /> <br />FIVE-YEAR COST <br />$150,000 <br /> <br />PROJECT TITLE <br />Ditch and Pond <br />Maintenance <br /> <br />SCHEDULED PROJECT ACTIVITY <br /> <br />FUNDING SOURCE 2000 <br />SWM Utility <br /> <br />2003 <br />$25,000 <br /> <br />2004 <br />$25,000 <br /> <br />FUTURE <br /> <br />2001 <br />$50,000 <br /> <br />2002 <br />$50,000 <br /> <br />LOCATION <br />Various ditches identified in the Ditch Maintenance Plan <br /> <br />DESCRIPTION <br /> <br />Clean stormwater ditches, re-grade ditch bottoms and slopes, and haul out excess material. <br /> <br />JUSTIFICATION <br /> <br />Many areas of the City ditches are nearly overgrown with vegetation, causing water to leave the ditch <br />banks and enter streets and private property during wet periods. <br /> <br />CURRENTSTATUS~ROJECTEDSCHEDULE <br /> <br />The City Engineer and Public Works Director studied the ditches in 1998. In May, 1999, the City <br />Engineer issued a Drainage Report that included future maintenance plan recommendations. <br /> <br />RELATIONSHIP TO EXISTING PLANS AND OTHER PROGRAMS <br /> <br />Part of the Public Works plan to become more pro-active on infrastructure maintenance. <br /> <br />. <br /> <br />. <br /> <br />. <br />