Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br /> <br />FIVE-YEAR CAPITAL IMPROVEMENT PLAN <br /> <br />DEPARTMENT PROJECT TITLE PROJECT FIVE-YEAR COST <br />Parks and Recreation S. Round Lake NUMBER <br />Trail (Welsh to 609-03 <br />Parkshore Drive) <br />SCHEDULED PROJECT ACTIVITY <br /> <br />2000 2001 2002 2003 <br />$227,000 <br /> <br />$227,000 <br /> <br />FUNDING SOURCE <br />Possible DNR Grant, <br />Park Fund <br />LOCATION <br />West Round Lake Road area (Gateway Business District) <br /> <br />2004 <br /> <br />FUTURE <br /> <br />DESCRIPTION <br /> <br />This project would include the construction of a pedestrianlbike trail along the south side of <br />Round Lake. Specifically, it would complete the loop from the existing trail, constructed as part <br />of the Welsh Development project, east to Parkshore Drive. It would require the acquisition of <br />easements of land for the trail. <br /> <br />JUSTIFICATION <br /> <br />The trail would complete the line through the GBD and around the lake. Eventually, it will <br />connect into a proposed trail into New Brighton and south along Old Highway 10. <br /> <br />CURRENTSTATUS~ROJECTEDSCHEDULE <br /> <br />The City must conclude property acquisition discussions. <br /> <br />RELATIONSHIP TO EXISTING PLANS AND OTHER PROGRAMS <br />