My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-13-1999
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1999
>
CCP 12-13-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:48 PM
Creation date
11/13/2006 11:28:56 AM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.- <br /> <br />APPLICATION FOR PARTIAL PAYMENT <br />CITY OF ARDEN HILLS 1998 STREET RECONSTRUCTION <br />AND MAINTENANCE IMPROVEMENTS (FINAL PAYMENT DONE) <br /> <br />eBRW <br /> <br />File: 37951-003-8001 <br /> <br />Seq. No/ <br />MnDot No Item <br /> <br />Unit <br /> <br />Unit <br />Price <br /> <br />Contract <br />Quantity <br /> <br />Contract <br />Amount <br /> <br />To Date <br />Quantity <br /> <br />12/08/99 <br />Page: 12 <br /> <br />To Dat", <br />Amount <br /> <br />-------- ------------------------ ------- ---------- --------- ----------- --------- ----------- <br /> <br />29 STREET SWEEPER (WITH <br />0123.601 PICKUP BROOM) <br /> <br />30 TRAFFIC CONTROL <br />0563.604 <br /> <br />31 F&I SIGN PANEL TYPE C <br />2564.531 <br /> <br />32 BALE CHECKS <br />2573.501 <br /> <br />33 SODDING, TYPE LAWN WITH m2 <br />2575.502 4" TOPSOIL <br /> <br />Bid Schedule: H - EDGEWATER AVENUE <br /> <br />- <br /> <br />375mm RCP APRON <br /> <br />0501. 602 <br /> <br />HR <br /> <br />75.00 <br /> <br />LS <br /> <br />4000.00 <br /> <br />m2 <br /> <br />200.00 <br /> <br />EA <br /> <br />6.00 <br /> <br />3.00 <br /> <br />STORM SEWER <br /> <br />EA 420.00 <br /> <br />2 TRASH GUARD FOR 375mm RCP EA <br />0501.602 APRON <br /> <br />367.50 <br /> <br />3 TRENCH STABILIZATION ROCK m3 <br />0501.604 <br /> <br />19.11 <br /> <br />4 100mm HPDE OR PVC <br />2503.541 SUBDRAIN <br /> <br />5 300mm RCP DESIGN 3006 <br />2503.541 CLASS-V <br /> <br />6 375mm RCP DESIGN 3006 <br />2503.541 CLASS-V <br /> <br />7 450mm RCP DESIGN 3006 <br />2503.541 CLASS-V <br /> <br />8 CONSTRUCT CATCH BASIN <br />2506.507 (610mm X 914mm) <br /> <br />~9 CONSTRUCT MANHOLE CATCH <br />~.507 BASIN (1200mm) <br /> <br />m <br /> <br />25.30 <br /> <br />m <br /> <br />79.80 <br /> <br />m <br /> <br />68.25 <br /> <br />m <br /> <br />89.25 <br /> <br />EA <br /> <br />997.50 <br /> <br />EA <br /> <br />1155.00 <br /> <br />10.00 <br /> <br />0.10 <br /> <br />4.00 <br /> <br />20.00 <br /> <br />2960.00 <br /> <br />2.00 <br /> <br />2.00 <br /> <br />15.00 <br /> <br />265.00 <br /> <br />160.00 <br /> <br />25.00 <br /> <br />240.00 <br /> <br />4.00 <br /> <br />6.00 <br /> <br />750.00 <br /> <br />400.00 <br /> <br />800.00 <br /> <br />120.00 <br /> <br />8880.00 <br /> <br />3.00 <br /> <br />0.10 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />2885.00 <br /> <br />Subtotal: $ <br /> <br />840.00. <br /> <br />735.00 <br /> <br />286.65 <br /> <br />6704.50 <br /> <br />12768.00 <br /> <br />1706.25 <br /> <br />21420.00 <br /> <br />3990.00 <br /> <br />6930.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />180.00 <br /> <br />132.00 <br /> <br />0.00 <br /> <br />260.00 <br /> <br />5.00 <br /> <br />4.00 <br /> <br />225 .00 <br /> <br />400.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />8655.00 <br /> <br />149,333.58 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />4554.00 <br /> <br />10533.60 <br /> <br />0.00 <br /> <br />23205.00 <br /> <br />4987.50 <br /> <br />4620.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.