My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-10-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 01-10-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:51 PM
Creation date
11/13/2006 1:22:23 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />. <br /> <br />e <br /> <br />e <br /> <br />Memorandum, Preparation of Plans and Specifications, 2000 Street Improvement Project <br />Page Three <br />January 6, 2000 <br /> <br />Also, the vacation of Hamline A venue between Ingerson Road and <br />Tiller Avenue ( discussion point #3 above) is necessary for the <br />construction of Pond B. <br /> <br />7. Fernwood Court Channel Modifications at an estimated cost of $50,000. <br /> <br />NOTE: <br /> <br />This would include deepening the existing channel to Lake Josephine <br />and the construction of a weir (restriction) at the channel outlet to the <br />lake, thereby increasing the cleansing affect of the channel on stormwater <br />runoff prior to entering Lake Josephine. Staff would also look to the Rice <br />Creek Watershed District for funding using the same formula as with the <br />proposed ponds, which would amount to an estimated $37,500. <br /> <br />NOTE: <br /> <br />Again, drainage will work well without any channel modifications, <br />but in this case, no pretreatment of stormwater runoff would occur prior to <br />the stormwater entering Lake Josephine. <br /> <br />8. Project Funding <br />The City Council may wish to determine the funding sources for meeting project costs, and <br />the specific breakdown from these sources. The Feasibility Report addresses this issue, and <br />provides a possible scenario for Council consideration. <br /> <br />Reauest <br />If the City Council elects to proceed with the 2000 Street Improvement Project, staff requests <br />Council adoption of Resolution #00-05, authorizing the City EngineerlBRW to prepare detailed <br />plans and specifications in the matter of the 2000 Street Improvement Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.