Laserfiche WebLink
<br />, <br /> <br />. <br /> <br />e <br /> <br />e <br /> <br />Memorandum, Preparation of Plans and Specifications, 2000 Street Improvement Project <br />Page Three <br />January 6, 2000 <br /> <br />Also, the vacation of Hamline A venue between Ingerson Road and <br />Tiller Avenue ( discussion point #3 above) is necessary for the <br />construction of Pond B. <br /> <br />7. Fernwood Court Channel Modifications at an estimated cost of $50,000. <br /> <br />NOTE: <br /> <br />This would include deepening the existing channel to Lake Josephine <br />and the construction of a weir (restriction) at the channel outlet to the <br />lake, thereby increasing the cleansing affect of the channel on stormwater <br />runoff prior to entering Lake Josephine. Staff would also look to the Rice <br />Creek Watershed District for funding using the same formula as with the <br />proposed ponds, which would amount to an estimated $37,500. <br /> <br />NOTE: <br /> <br />Again, drainage will work well without any channel modifications, <br />but in this case, no pretreatment of stormwater runoff would occur prior to <br />the stormwater entering Lake Josephine. <br /> <br />8. Project Funding <br />The City Council may wish to determine the funding sources for meeting project costs, and <br />the specific breakdown from these sources. The Feasibility Report addresses this issue, and <br />provides a possible scenario for Council consideration. <br /> <br />Reauest <br />If the City Council elects to proceed with the 2000 Street Improvement Project, staff requests <br />Council adoption of Resolution #00-05, authorizing the City EngineerlBRW to prepare detailed <br />plans and specifications in the matter of the 2000 Street Improvement Project. <br />