Laserfiche WebLink
<br />I <br /> <br />~. <br /> <br />Jan, 3, 2000 3:32PM <br /> <br /> <br />AJA, INC 6125440531 <br /> <br />e January 3, 2000 <br /> <br />Ms, Nancy Randall, Associate Planner <br />City of Arden Hills <br />4364 W. Round Lake Road <br />-Arden Hills, MN--55H-2~5-194--- <br /> <br /> <br />e <br /> <br />e <br /> <br />Re: BETHEL COLLEGE - WEST PROPERTY <br />Bethel College & Seminary <br />Plan Review <br /> <br />Dear Ms, Randall: <br /> <br />Thank you for your facsimile with response(s) to our PlanReview submission packet relative to <br />the above referenced project, We would like to respond to the issues raised by Mr, Greg Brown. <br />Our response follows the same format as Mr. Brown's letter. <br /> <br />1. <br /> <br />Old Higbway 10 issues. We have located the crosswalk between the college entrance <br />, and the new recreational site based on rough design plans provided by Ramsey County, <br />but will need to be specifically located upon final determination oftbe walk 10catioi1(s). <br />Signage issues will need to confirmed with Ramsey County, but at this time we see no <br />issue with adding "Crosswalk Ahead" signs lis well as "Right Turn" lane signs. <br />Likewise, striping of lanes will need to be confinned with the County. <br /> <br />2. ' Restroom Facility. At this time, portable toilet facilities have been designated for use <br />on-site. Screening for the satellites will be provided as an integral part of the sports <br />service building. Bethel College, after reviewing the possibility of including a restroom <br />facility, feels that the park users will be adequately served by the portable units; which <br />will be continually and periodically maintained and serviced, As a note, in ordi:r to <br />provide a connection to the nearest sanitary manhole (at the intersection of McCracken <br />and Hwy 10), there would be a need for pumping and a section of force main. which <br />would certainly add significant cost to the project, <br /> <br />3. Sidewalk. We will review the issue of widening the asphalt sidewalk from 6' to 8' or <br />changing it to concrete. <br /> <br />4. Curb and Gutter Limits, The curb and gutter will-be extended to the County ROW <br />,line, <br /> <br />5, <br /> <br />Add Catch BaSins: The RCWD has requested tbat.We maximize storm water retention <br />in'the form of an infiltration basin on the northwest side of the entrance drive. In this <br />area, the County ditch will be 'dammed' for retention (at a critical elevation, the runoff <br /> <br />VALLEY SQUARE OFACE CENTER . SUITE 200 . 7575 GOLDEN VALLEY ROAD . MINNEAPOUS, MN 55427 - <br />PH (612) 544-7129 . FAX(612)544-ll!i31 ' <br />