Laserfiche WebLink
<br />3/lb <br /> <br />-3- <br /> <br />'. <br /> <br />12. <br /> <br />Signage Plan <br />No signage is anticipated as part of this project. <br /> <br />13. Building Plans <br />The following plans are being submitted as part of this site plan application: <br /> <br />. <br /> <br />a1 Pavilion Plan - (2 full size & 2 reduced 11" x 17" sheets) <br />a1.1 Pavilion Elevations - (2 full size & 2 reduced 11" x 17" sheets) <br />a2 Picnic Shelter - Plan and Elevations (2 full size & 2 reduced 11" x 17" <br />sheets) <br />a3 Beach House - Plan and Elevations(2 full size & 2 reduced 11" x 17" <br />sheets) <br />a4 Gazebo - Plan and Elevations(2 full size & 2 reduced 11" x 17:' sheets) <br />a5 Toilet Building(s) - Plan and Elevations(2 full size & 2 reduced 11" x 17" <br />sheets) <br />Color perspective of Pavilion <br />Color perspective of Picnic Shelter <br />Color perspective of Beach House <br />Coior perspective of Gazebo <br />Color perspective of Toilet Building. <br /> <br />14. <br /> <br />Variances Required <br />No variances are requested as part of this submittal. <br /> <br />15. Project Schedule <br />The proposed project schedule for the park buildings has construction commencing near <br />April of 2000 and ccmpletion at the end of October 2000. <br /> <br />16. Names and Addresses of Owners within 350 feet of Project <br /> <br />Attached are the addresses requested. <br /> <br />. <br />