Laserfiche WebLink
<br />Draft Feasibility Study Recommended Alternative: <br />. Site A Unit I: Continue containment pwnping and monitoting of the groundwater; utilize institutional <br />controls; undertake air stripping treatment or discharge, Rice Creek discharge, source characterization and <br />remediation. <br />. Site A Soils: Undertake excavation, soil washing/leaching, handling of other materials, backfilling. <br /> <br />Site B is located along the northern boundary ofTCAAP. Before 1940, this portion of the site was occupied by <br />farmsteads. Material was dumped in the farmstead building foundations. It is believed that sewage sludge was <br />disposed here before 1966. Contaminants of concern include PCBs, pesticides, VOCs, semi-volatiles, explosives <br />and heavy metals. However, no significant contamination has been found at this site. <br /> <br />Interim Remediation: No remediation has been performed at this site. The Feasibility Study recommends no <br />further action since significant contamination has not been found here. <br />Draft Feasibility Study Recommended Alternative: Remedial alternatives for Site B were not recommended <br />because contaminants did not exceed preliminary clean-up goals. <br /> <br />Site C is located immediately east of Mounds View Road within the central portion ofTCAAP. It was used for <br />burrting lumber, solvents, oils, maizo (com cobs), and possibly other production materials. The site was also used <br />as an open storage area. Contaminants of primary concern include solvents, oil, grease, dioxins, explosives, <br />propellants and metals. Soil contamination has been docwnented. Low levels of groundwater contamination have <br />been detected sporadically. <br /> <br />Interim Remediation: No remediation has been performed at this site. <br />Draft Feasibility Study Recommended Alternative: Undertake excavation, soil washinglleaching, handling of <br />other materials, backfilling <br /> <br />Site D is located 220 feet west of Snelling A venue, south-southeast of the reservoir in the south-central part of <br />TCAAP. Several pits on the site were used to dispose of powder water, oil, grease, solvents, rags and neutralized <br />cyanide. Other materials disposed at Site D include primer and tracer powder, scrap propellant, thinner, varnish and <br />swnp waste. Western ball powder, solvent, contaminated rags, scrap chemicals and oil were disposed of in the rag <br />pit. Oil and grease were reportedly burned daily in the oil pit. Contaminants of concern include VOCs, PCBs, <br />solvents, heavy metals, semi-volatiles, thinners, oils and cyanide. Soil and groundwater contamination are present. <br />An eighteen-inch clay cap was laid over the site to prevent precipitation infiltration. <br /> <br />Interim Remediation: In February 1985, 1400 cubic yards of PCB-contaminated soils were excavated and <br />stockpiled; in 1989, this soil was incinerated on-site. A soil vapor extraction system was installed on the site in <br />Fcbruary 1986 to remove VOC contamination and is still in operation today. Studies indicate that most of the <br />VOC soil contamination has been removed. <br />Draft Feasibility Study Recommended Alternative: Continue existing SVE operation, expand with deep vents, <br />impose institutional controls. <br /> <br />Site E consists of approximately 7.6 acres located in the central portion of TCAAP. This site was formerly used as a <br />non-combustible landfill and as a burning area for combustible and explosive wastes. Contaminants of primary <br />concern include VOCs, semi-volatiles, explosives, dioxins, furans and heavy metals. VOC contamination and low <br />concentrations of metals have been detected in the groundwater. Metals were detected in a nurnber of soil samples <br />from the site. <br /> <br />Interim Remediation: No remediation has been conducted at this site. Soil washing is a recommended clean-up <br />alternative in the Feasibility Study. <br />Draft Feasibility Study Recommended Alternative: Undertake excavation, soil washing/leaching, handling of <br />other materials, backfilling. <br /> <br />Camiros, Ltd.lSEH, Inc./LHDL, Ltd. <br /> <br />TCAAP Framework Plan <br />Page 26 <br /> <br />Chapter 11 <br /> <br />I <br /> <br />.- <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />ea <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />- <br /> <br />I <br /> <br />I <br /> <br />.1 <br />I <br /> <br />I <br />