My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-28-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 02-28-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:15:58 PM
Creation date
11/13/2006 1:23:29 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Df""" A' FT <br />: f~{ f" <br /> <br />23 <br /> <br />ARDEN HILLS CITY COUNCIL - FEBRUARY 14,2000 <br /> <br />e The plan did show the proposed locations of each building. The proposed buildings are in the <br />same general location as the concept proposal. <br /> <br />The applicant was proposing six buildings; Picnic Pavilion, Picnic Shelter, Beach Building, <br />Gazebo, and two restroom buildings in various locations throughout the site with this phase. The <br />buildings will be of a prairie style and will be easy to clean. The picnic pavition was designed to <br />be used by multiple groups. <br /> <br />The buildings meet the height and setback requirements including the required 75-foot setback <br />from the Ordinary I-lign W"tf'T M"Tk "ncl residential properties. The existing buildings will be <br />removed. <br /> <br />Ms. Randall advised that the Planning Commission recommended approval of Planning Case <br />#00-10, Site Plan Review, subject to the following conditions: <br /> <br /> l. <br /> 2. <br /> 3. <br />e 4. <br />5. <br /> 6. <br /> <br />e <br /> <br />Submittal for site plan approval prior to the commencement of construction of any <br />additional phases ofthis project. <br />Compliance with the City's Shoreland Ordinance. <br />Approval of the grading, drainage, and erosion control plans by the Rice Creek <br />Watershed District. <br />The smallest amount of bare ground is exposed for as short as time as feasible. <br />Approval of the necessary wetland impact permits from Rice Creek Watershed District, <br />Minnesota Department of Natural Resources, and the U.S. Army Corps of Engineers. <br />Notification, review, and approval of all utility plans by City Staff. <br /> <br />Mr. Larry Holmberg, Ramsey County Parks Department, introduced himself and Jerry Hagen, <br />HCM, and offered to present the color renderings of the proposed buildings. <br /> <br />Mayor Probst stated that the City was contacted by Ms. Kathy Nelson, 3475 Siems Court, <br />suggesting that Ramsey County consider selecting colors for the playground equipment that <br />would blend into the natural surroundings, rather than selecting a loud color that would be tess <br />aesthetically pleasing to residents. <br /> <br />Mr. Hagen presented the color renderings of the proposed buildings and explained their <br />locations. <br /> <br />Mayor Probst asked if the playground equipment will be installed this year. Mr. Holmberg stated <br />that they will be. Mayor Probst confirmed that the entire southern portion of the park will be <br />completed with this construction phase. Mr. Holmberg stated that additional trails will be added <br />next year. <br /> <br />Mayor Probst asked if the paving area that extends beyond the picnic shelters will be concrete. <br />Mr. Hagen stated that this was correct. He noted that the concrete will be a muted color rather <br />than gray. <br />
The URL can be used to link to this page
Your browser does not support the video tag.