<br />,"I',.
<br />
<br />.).:{i;~:r'!,F'
<br />
<br />
<br />","", ,',,,. "''''II'' ""."'.'1"'.''''
<br />i lid!!; :' ,:jr1[,'i,:,'!,'" ,', ;ii'fl,i~' n
<br />.".,', i".'I,.,,!!!):::' .!lli' !.ii" : ',..II"'lli~:~., , '1;1')]eH :.'
<br />1.1, ij ";~. ., ,,;i.ll:,.'. . .J. j:' 1 : .~. .
<br />
<br />"r:lii1": '1'"'' ,. "':"I;I'I'I!I.,'~uiI"';'iUJ::"""E.m,.'!.Iiii\','" "s' """",!lI";(itl"'.', T......"
<br />: !1;:Ir!!'~' ., ..""!".;,,,:!i'.ij!;.!;i;?" D t:i' I~f ~I!J ,J1!nV" :D'
<br />!:i,II::: ';"!IJ!!'ll'" ..:,"Itl,.' ,,;1:'" ;:"1, .., ,:,::";:::Ih'"
<br />
<br />.
<br />
<br />Cablecasting/ITV System
<br />
<br />Cameras are required for citizens watching the cablecast. Two' cameras are considered
<br />minimum requirements to maintain a professional cablecast persona, however a three-camera
<br />system is recommended.
<br />Estimated co~! for a three,~.amera system: $33,000
<br />
<br />The control room operator will need a camera controller for these cameras.
<br />Estimated camera controller cost:
<br />
<br />"-,~~------
<br />
<br />The control room operator is positioned in front of an equipment console, which holds the
<br />audio/visual equipment required for the cablecast.
<br />Estimated cost for equipment console: $5,800
<br />
<br />Recording and playbaCk of the council meetings will require the purchase of two new SVHS
<br />VCRs.
<br />~stimated i~stalled cost f?! the control.room vCR system: $2,600
<br />
<br />Equipment is required to interconnect all of the control room gear for a complete and
<br />operational system. These components of switchers, monitors, converters, and distribution
<br />gear are all budgeted within this section.
<br />!?tal estimat:d cablecast interconnection equipment c~st: $19,600
<br />
<br />Besides a video signal, an audio signal is also required to achieve sound for the cable
<br />audience. A small, separate sound control system is recommended.
<br />Estimated cost for the sound c~ntrol system: ~_ $3,100
<br />
<br />The quality signal to the citizens watching the cablecast is largely the responsibility of the
<br />cable provider. There are a few processing equipment pieces that the City needs to provide
<br />to ensure that a quality signal is available to the cable company for distribution.
<br />Estim.ated processing equipment_~ost: $3,500.
<br />
<br />Many cities are choosing to display announcements and messages over their local cable
<br />access channel. The existing Scala bulletin board system will be integrated into the new
<br />system..
<br />Estimated cost for the int~tion into ~e new system: $2,000
<br />
<br />Cablecasting/ITV System Estimated Total: $73,100
<br />
<br />$3,500
<br />
<br />.
<br />
<br />.
<br />
<br />Electronic Interiors, Inc
<br />
<br />6
<br />DRAFT
<br />SHOIH31NI JINOH1J3l3
<br />
<br />May 9, 1999
<br />
<br />11/8'rl QVS9'oN
<br />
<br />WdLS:ZI OOOZ 'sz.unr
<br />
|