My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-10-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 07-10-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:08 PM
Creation date
11/13/2006 1:24:59 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />.BRW <br /> <br />Bf'i:Ulllt.lt A DAMES & MOORE GROUP COMPANY <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, Minnesota 55415 <br />6123700700 Tel <br />612370 1378 Fax <br />v.rww.brwinc.com <br /> <br />July 6, 2000 <br /> <br />Mr. Joe Lynch <br />City Administrator <br />City of Arden Hills <br />4364 West Round Lake Road <br />Arden Hills, MN 55112 <br /> <br />RE: 2000 Seal Coating Project <br /> <br />Dear Mr. Lynch: <br /> <br />Bids were received and opened for the above-referenced project on June 29, 2000. Three bids were <br />received and the low bid was from Allied Blacktop in the amount of $40,562.50. All bids included a j 0% <br />bond as required by the Project Manual and were verified &s correct. The bid outcome is &s .follows: <br /> <br />I <br />2 <br />3 <br /> <br />Allied Blacktop <br />Asphalt Surface Technologies Corp <br />Pearson Bros., Inc. <br /> <br />$40,562.50 <br />$40,625.00 <br />$44,937.00 <br /> <br />The Engineer's Estimate for the work is $57,000.00. The substantial difference between the Engineers <br />Estimate and the actual bid prices can be attributed to a very competitive bidding market and the fact that <br />city crews performed the crack sealing of the roadways and will complete the sweeping of the excess <br />aggregate after the seal coating. The City has had very positive experience with Allied Blacktop in the past <br />and we are confident that the Contractor is able to complete the work satisfactorily. <br /> <br />The City Engineer, therefore, recommends the award of the 2000 Seal Coating Project to Allied Blacktop <br />for the total amount of $40,562.50. Due to the fact that $60,000 was budgeted for seal coating this year <br />the Council may consider adding the seal coating of Lake Johanna Fire Station No. I and the Trinity <br />Lutheran Church (Hazelnut Park) parking lots to the contract. BRW estimates this additional work to cost <br />approximately $10,000.00. <br /> <br />Offices Worldwide <br />
The URL can be used to link to this page
Your browser does not support the video tag.