My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-31-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 07-31-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:10 PM
Creation date
11/13/2006 1:25:13 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ROOfINCiCOMPANYlNC. <br /> <br />. HOT ASPHALT ROOFS <br />. SINGLE PLY RUBBER ROOFS <br />. PREVENTATIVE MAINTENANCE <br />-REPAIAS <br />. RESIDENTIAL ROOFING <br /> <br />Since 1938 <br /> <br />., , <br />w <br /> <br /> <br />~ <br /> <br />~ <br /> <br />HTfRIORS <br /> <br />. SEAMLESS GUTTEAS <br />. SIDING <br />. SOFFIT. FASCIA <br /> <br />License # <br />4229 <br />6970 <br /> <br />CUSTOMER COpy <br /> <br />City of Arden Hills <br />4361 West Round Lake Road <br />Arden HlIIs, MN 55112 <br /> <br />May I, 2000, <br /> <br />We propose to tear off and reroof 1440 West Highway 96 city maintenance building at the above address: <br /> <br />. Tear off the existing roofing down to the existing roof deck or metal decking. Clean up and haul away all <br />debris from the premises. <br /> <br />. Replace any deteriorated decking (if any) at a separate price based on labor and materials, above the contract <br />price. Price for labor and materials would be: $58.00 per hour, per man, plus the cost of materials. <br /> <br />. Mechanically fasten one layer of 2. 7" Isocyanurate roof insulation over the entire roof surface. <br /> <br />e <br /> <br />. Mop one layer 1f2" Perlite roof insulation over the entire roof surface. <br /> <br />. Install 4 layers of Type N fiberglass felt, running all felts up into the base flashings. Each layer of felt will <br />be mopped in solid with hot asphalt at a rate of no less than 25 Ibs. per sq. This is done according to the <br />GAP NDL manufacuturer's specifications. <br /> <br />. Flash all walls, curbs, chimneys, etc., with an additional layer of modified bitumen 160 mil flashing <br />material, fasten and secure. <br /> <br />r.'. ]nstall-ne,w pitch pans to replace the exist,ing pitch pans <br /> <br />. Install new g~lvanized sheet metal plumbing stacks of two piece construction with lead tops. <br /> <br />6NTINUED ON PAGE 2 <br /> <br />...........,...,.."...",............"..."....,......,".,.............,...",..."....,...".,...,.........".........,..,.....,......,....,...,..,...,...,..."...,. <br /> <br />2701 36TH AVENUE SOUTH. MINNEAPOLIS. MINNESOTA 55406 <br />Serving the Entire Metro Area 729~2325 729-7802 Fax 729~6661 <br />
The URL can be used to link to this page
Your browser does not support the video tag.