Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />August 24, 2000 <br /> <br />SUBJECT: <br /> <br />Joe Lynch, City Administrator <br />Dw'Y" S"""n!, P,'b, W,d" Di='" .'9) <br /> <br />County Road E Street Light Poles <br /> <br />TO: <br /> <br />FROM: <br /> <br />Background <br />At the August 21,2000, City Council Work Session, the Council was provided evidence <br />ofthe deterioration of the 17 street light poles on County Road E. These poles are <br />between Lexington Avenue and Highway 51 and are owned and maintained by the City. <br /> <br />. <br /> <br />Council Direction <br />The City Council instructed staff to seek costs for reinforcing the bottom of those poles <br />and have the Opcrations and Finance Committee research other design options for <br />replacing the existing streetlights on County Road E in the near future. The Operations <br />and Finance Committee should provide a list of 2 or 3 design options and present this list <br />to the Planning Commission. Both committees will discuss the options jointly and <br />provide a recommendation to Council. This process would need to begin immediately to <br />insure the new streetlights will be installed in time for the City's 50-Year celebration. <br /> <br />Existing Street Li~ht Reinforcemcnt Costs <br />The Public Works Director has contacted Boe Ornamental Iron Inc. ofLino Lakes to <br />inspect the cxisting street lights and prcpare an estimate for reinforcing 16 of the 17 street <br />light poles on County Road E. The 17th pole, which had broken off previously, will bc <br />replaced by one that was removed years before during signalization ofthe intersection by <br />McDonalds. Thc attached estimate indicates a cost of $31 04. 00 for the reinforcing. <br /> <br />Recommendation <br />The Public Works Director has worked with Boe Ornamental previously with excellent <br />results and recommends that Council authorize staff to enter into an agreement with Boe <br />Ornamental Iron, Inc. to reinforce 16 City streetlight poles at a cost not to exceed <br />$3,104.00. <br /> <br />. <br />