My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-10-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 10-10-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:18 PM
Creation date
11/13/2006 1:26:15 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />I <br /> <br />BRW, Inc. <br /> <br />October 10, 2000 <br /> <br />Honorable Mayor and <br />Members of the City Council <br />City of Arden Hills <br />4364 West Round Lake Road <br />Arden Hills, MN 55112-5794 <br /> <br />ATIN: Mr. Dwayne Stafford <br />Public Works Director <br /> <br />RE: <br /> <br />Feasibility Study for <br />2000 Street Improvements Project <br /> <br />Honorable Mayor and Members of the City Council: <br /> <br />The enclosed feasibility report has been prepared examining the proposed reconstruction of residential <br />streets within the Ingerson Road neighborhood as aulhorized at the Seplember II. 2000 Council meeting. <br />The report has been revised from its original version received by the Council at the November 8, 1999 <br />meeting. The streets included in the study are Ingerson Road, Ingerson Court, Femwood Street. Femwood <br />Court. Carlton Drive, Cannon Avenue and N. Hamline Avenue. Tiller Lane. Dellwood Street and Dunlap <br />Street are also located in the neighborhood but were reconstructed 10 City standards wilhin the past ten <br />years and therefor are not be included in this project. This report will evaluate the feasibility of the <br />proposed improvements as refined from the original report over the course of the Ingerson Neighborhood <br />Task Force meetings and Council and City staff input over the past several monlhs. <br /> <br />The general scope of work includes the reconstruction of Ingerson Road. Ingerson Court. Femwood Street. <br />Fernwood Court. Carlton Drive, Cannon A venue and N. Hamline A venue with concrete curb and gutter or <br />edge strips, bituminous pavement and storm sewer. The proposed improvements include hydrant <br />relocation and some sanitary sewer repair work identified from the recently completed sewer televising. <br />Storm Sewer and drainage improvements have been modified from the original report to include the use of <br />rain gardens where appropriate. <br /> <br />Information utilized in the preparation of this report includes information from the Pavement Management <br />Program field survey conducted earlier this year by BR W staff, aerial mapping. as-built plans, GIS <br />property information and other information from field investigations and surveys on the site. <br /> <br />We are of the opinion that the improvements as outlined in this report are feasible and would replace <br />deficient pavements with standardized City street sections. greatly reduce nuisance flooding in the <br />neighborhood, improve local water qualily, reduce city maintenance costs and significantly enhance the <br />overall aesthetics of the neighborhood. <br /> <br />Sincerely. <br /> <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />612.370.0700 Tel <br />612.370.1378 Fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.