My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-10-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 10-10-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:18 PM
Creation date
11/13/2006 1:26:15 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />~ <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />It <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />FERNWOOD STREET CONSTRUCTION <br />(BASED ON 28' F -F) <br /> <br /> Unit <br />No. Item Unit Ouantitv Price Extension <br />1 Mobilization LS 1.0 $ 2,300.00 $ 2,300.00 <br />2 Bituminous Pavement Removal SY 1,050.0 $ 2.00 $ 2,100.00 <br />3 Miscellaneous Removals LS 0.1 $ 20,000.00 $ 2,000.00 <br />4 Common Excavation CY 793.0 $ 6.50 $ 5,200.00 <br />5 Select Granular Base (12") CY 397.0 $ 12.00 $ 4.800.00 <br />6 Aggregate Base CL 5 (8") CY 264.0 $ 14.00 $ 3,700.00 <br />7 Bituminous Base Course (2") TON 115.0 $ 30.00 $ 3,500.00 <br />8 Bituminous Wear Course (2") TON 115.0 $ 32.00 $ 3,700.00 <br />9 Bituminous Material for Tack Coat GAL 50.0 $ 1.90 $ 100.00 <br />10 Concrete Curb and Gutter (B618) LF 640.0 $ 8.00 $ 5,100.00 <br />11 Traffic Control LS 0.1 $ 25,000.00 $ 2.500.00 <br />12 Signage SF 18.0 $ 30.00 $ 500.00 <br />13 Sodding SY 1,410.0 $ 3.00 $ 4,200.00 <br />14 Driveway Removal SY 68.0 $ 5.00 $ 300.00 <br />15 Bituminous Pavement (Driveway) SY 40.0 $ 25.00 $ 1,000.00 <br />16 Concrete Pavement (Driveway) SY 58.0 $ 40.00 $ 2,300.00 <br />17 Sawing Concrete Pavement LF 10.0 $ 5.00 $ 100.00 <br />18 Sawing Bituminous Pavement LF 24.0 $ 2.00 $ 100.00 <br /> Subtotal Construction Cost $ 43,500.00 <br /> 15% Contingency $ 6,500.00 <br /> SUBTOTAL Construction Cost wi Contingency $ 50,000.00 <br /> 26% Indirect Cost and Capitalized Interest $ 13,000.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ 63,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.