My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-10-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 10-10-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:18 PM
Creation date
11/13/2006 1:26:15 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />-- <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br /> CARLTON DRIVE CONSTRUCTION <br /> (BASED ON 28' F-F) <br /> Unit <br />No. Item Unit Ouamitv Price Extension <br />1 Mobilization LS 1.0 $ 11,200.00 $ 11,200.00 <br />2 Bituminous Pavement Removal SY 5,120.0 $ 2.00 $ 10,200.00 <br />3 Miscellaneous Removals LS 0.2 $ 20,000.00 $ 4.000.00 <br />4 Common Excavation CY 3.868.0 $ 6.50 $ 25,100.00 <br />5 Select Granular Base (12") CY 1,934.0 $ 12.00 $ 23,200.00 <br />6 Aggregate Base CL 5 (8") CY 1,290.0 $ 20.00 $ 25,800.00 <br />7 Bituminous Base Course (2") TON 550.0 $ 30.00 $ 16,500.00 <br />8 Bituminous Wear Course (2") TON 550.0 $ 32.00 $ 17,600.00 <br />9 Bituminous Material for Tack Coat GAL 240.0 $ 1.90 $ 500.00 <br />10 Concrete Curb and Gulter (B618) LF 3,070.0 $ 8.00 $ 24,600.00 <br />11 Traffic Control LS 0.2 $ 25,000.00 $ 5,000.00 <br />12 Signage SF 36.0 $ 30.00 $ 1,100.00 <br />13 Sodding SY 5,150.0 $ 3.00 $ 15,500.00 <br />14 Driveway Removal SY 623.0 $ 5.00 $ 3,100.00 <br />15 Bituminous Pavement (Driveway) SY 213.0 $ 25.00 $ 5,300.00 <br />16 Concrete Pavement (Driveway) SY 620.0 $ 40.00 $ 24,800.00 <br />17 Sawing Concrete Pavement LF 246.0 $ 5.00 $ 1,200.00 <br />18 Sawing Bituminous Pavement LF 128.0 $ 2.00 $ 300.00 <br /> Subtotal Construction Cost $ 215,000.00 <br /> 15% Comingency $ 32,300.00 <br /> SUBTOTAL $ 247,300.00 <br /> 26% Indirect Cost and Capitalized Interest $ 64,300.00 <br /> <br />Total Estimated Project Cost. <br /> <br />$ 311,600.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.