Laserfiche WebLink
<br />I <br />~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />-- <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br /> CARLTON DRIVE CONSTRUCTION <br /> (BASED ON 28' F-F) <br /> Unit <br />No. Item Unit Ouamitv Price Extension <br />1 Mobilization LS 1.0 $ 11,200.00 $ 11,200.00 <br />2 Bituminous Pavement Removal SY 5,120.0 $ 2.00 $ 10,200.00 <br />3 Miscellaneous Removals LS 0.2 $ 20,000.00 $ 4.000.00 <br />4 Common Excavation CY 3.868.0 $ 6.50 $ 25,100.00 <br />5 Select Granular Base (12") CY 1,934.0 $ 12.00 $ 23,200.00 <br />6 Aggregate Base CL 5 (8") CY 1,290.0 $ 20.00 $ 25,800.00 <br />7 Bituminous Base Course (2") TON 550.0 $ 30.00 $ 16,500.00 <br />8 Bituminous Wear Course (2") TON 550.0 $ 32.00 $ 17,600.00 <br />9 Bituminous Material for Tack Coat GAL 240.0 $ 1.90 $ 500.00 <br />10 Concrete Curb and Gulter (B618) LF 3,070.0 $ 8.00 $ 24,600.00 <br />11 Traffic Control LS 0.2 $ 25,000.00 $ 5,000.00 <br />12 Signage SF 36.0 $ 30.00 $ 1,100.00 <br />13 Sodding SY 5,150.0 $ 3.00 $ 15,500.00 <br />14 Driveway Removal SY 623.0 $ 5.00 $ 3,100.00 <br />15 Bituminous Pavement (Driveway) SY 213.0 $ 25.00 $ 5,300.00 <br />16 Concrete Pavement (Driveway) SY 620.0 $ 40.00 $ 24,800.00 <br />17 Sawing Concrete Pavement LF 246.0 $ 5.00 $ 1,200.00 <br />18 Sawing Bituminous Pavement LF 128.0 $ 2.00 $ 300.00 <br /> Subtotal Construction Cost $ 215,000.00 <br /> 15% Comingency $ 32,300.00 <br /> SUBTOTAL $ 247,300.00 <br /> 26% Indirect Cost and Capitalized Interest $ 64,300.00 <br /> <br />Total Estimated Project Cost. <br /> <br />$ 311,600.00 <br />