My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-10-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 10-10-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:18 PM
Creation date
11/13/2006 1:26:15 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />CARLTON DRIVE STORM SEWER CONSTRUCTION <br />(BASED ON 28' F -F) <br /> <br /> Unit <br />No. Item Unit Ouantity Price Extension <br />I Mobilization LS 1.0 $ 3,000.00 $ 3,000.00 <br />2 Remove Slorm Sewer Pipe LF 300.0 $ 5.00 $ 1,500.00 <br />3 Remove Storm Sewer Structure EA 6.0 $ 500.00 $ 3,000.00 <br />4 12" RCP LF 150.0 $ 25.00 $ 3,800.00 <br />6 21" RCP LF 571.0 $ 36.50 $ 20,800.00 <br />7 Catch Basin (2' x 3') EA 6.0 $ 1,200.00 $ 7.200.00 <br />8 Manhole (48") EA 2.0 $ 2,500.00 $ 5,000.00 <br />9 Manhole (60") EA 1.0 $ 3,000.00 $ 3,000.00 <br />10 Raingarden EA 5.0 $ 2,500.00 $ 12,500.00 <br />11 Cui verts LF 100.0 $ 20.00 $ 2,000.00 <br /> Subtotal Construction Cost $ 61,800.00 <br /> 15% Contingency $ 9,300.00 <br /> SUB TOT AL Construction Cost wi Conlingency $ 71,100.00 <br /> 26% Indirect Cost and Capitalized Interest $ 18,500.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ 89,600.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.