Laserfiche WebLink
<br />I <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />CARLTON DRIVE STORM SEWER CONSTRUCTION <br />(BASED ON 28' F -F) <br /> <br /> Unit <br />No. Item Unit Ouantity Price Extension <br />I Mobilization LS 1.0 $ 3,000.00 $ 3,000.00 <br />2 Remove Slorm Sewer Pipe LF 300.0 $ 5.00 $ 1,500.00 <br />3 Remove Storm Sewer Structure EA 6.0 $ 500.00 $ 3,000.00 <br />4 12" RCP LF 150.0 $ 25.00 $ 3,800.00 <br />6 21" RCP LF 571.0 $ 36.50 $ 20,800.00 <br />7 Catch Basin (2' x 3') EA 6.0 $ 1,200.00 $ 7.200.00 <br />8 Manhole (48") EA 2.0 $ 2,500.00 $ 5,000.00 <br />9 Manhole (60") EA 1.0 $ 3,000.00 $ 3,000.00 <br />10 Raingarden EA 5.0 $ 2,500.00 $ 12,500.00 <br />11 Cui verts LF 100.0 $ 20.00 $ 2,000.00 <br /> Subtotal Construction Cost $ 61,800.00 <br /> 15% Contingency $ 9,300.00 <br /> SUB TOT AL Construction Cost wi Conlingency $ 71,100.00 <br /> 26% Indirect Cost and Capitalized Interest $ 18,500.00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ 89,600.00 <br />