Laserfiche WebLink
<br />I <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />;. <br /> <br />I <br /> <br />City of Arden Hills <br />2000 Street Reconstruction Program <br /> <br />FERNWOOD STREET STORM SEWER CONSTRUCTION <br />(BASED ON 28' F-F) <br /> <br />No. <br /> <br />Item <br /> <br />Unil Ouantitv <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br /> <br />Mobilization LS <br />Remove Storm Sewer Pipe LF <br />Remove Storm Sewer Structure EA <br />12" RCP LF <br />27" RCP LF <br />Catch Basin (2' x 3') EA <br />Manhole Calch Basin (60") EA <br />Subtotal Construction Cost <br /> <br />15% Contingency <br /> <br />SUB TOT AL Construction Cost wi Contingency <br />26% Indirect Cosl and Capitalized Interest <br /> <br />Total Estimated Project Cost _ <br /> <br />Unit <br />Price <br /> <br />Extension <br /> <br />1.0 $ 1,400.00 $ 1,400.00 <br />347.0 $ 5.00 $ 1,700.00 <br />3.0 $ 500.00 $ 1,500.00 <br />67.0 $ 25.00 $ 1,700.00 <br />360.0 $ 48.00 $ 17,300.00 <br />2.0 $ 1,200.00 $ 2,400.00 <br />1.0 $ 3,000.00 $ 3,000.00 <br />$ 29,000.00 <br /> <br />$ 4,400.00 <br /> <br />$ 33,400.00 <br />$ 8,700.00 <br /> <br />$ 42,100.00 <br />