My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-16-2000
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2000
>
CCP 10-16-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:18 PM
Creation date
11/13/2006 1:26:41 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />October 10, 2000 <br /> <br />FROM: <br /> <br />Joe Lynch, City Administrator <br /> <br />Thomas J. Moore, Parks and Recreation Director ~ { ~ <br /> <br />TO: <br /> <br />SUBJECT: <br /> <br />Parks and Recreation Third Quarter Report <br /> <br />Parks <br /> <br />e <br /> <br />. Trim work on trees! brush was completed on the entire Trail system. <br />. A tree inventory was completed for the entire Park system. <br />. New Soccer Fields were established at; Perry Park, Floral Park and Presbyterian <br />Homes, <br />. Blacktop projects were completed at; <br />- Sampson Park- parking lot + trail connection <br />- Freeway Park- driveway to the Hockey Rink <br />- Perry Park- Wanninghouse entrance <br />. Hockey Rinks were painted at Perry Park and Cummings Park. <br />. Wanninghousc door locks were re-keyed onto a Master Key system, <br />. All Swingsets and Basketball Poles were painted. <br />. Rain Gage On! Off switch was installed on the Irragation System at Perry Park. <br />. The Arden Hills Parks crew repaired the lire damage at the warminghouse at <br />Cummings Park. <br />. The following Boy Scout projects were completed at Crepeau Kature Preserve; <br />_ Six -inch layer of wood chips placed on the trail system. <br />- The Sportsman Bridge was repaired <br />- Two wildlife Dams were constructed to improve habitat. <br />. New Park Benches were installed at Crepeau Nature Preserve and at three tail <br />locations. <br />. Nine Park Bench Swings were reconditioned. <br /> <br />Recreation <br /> <br />e <br /> <br />. The Fall Recreation Guide received a new design and fOlmat. <br />. 20 Adult Softball teams participated in the Fall League. <br />. Offered a total of 63 programs for the Summer Session, of which 19 were cancelled. <br />This is a 70% success rate. Last year's success rate was 65%. <br />. 706 people participated in the Summer Session programs. <br />. The Fall Youth Soccer League has; 23 Teams, 277 participants and 45 coaches. <br />
The URL can be used to link to this page
Your browser does not support the video tag.