My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-08-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 01-08-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:28 PM
Creation date
11/13/2006 2:35:52 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />JRN-04-2001 17:19 <br /> <br />BRW <br /> <br />512 373 5525 ~,~l/~J <br /> <br /> <br />BRW,inc. <br /> <br />January 4,2001 <br /> <br />Mr, Joe Lynch <br />City Administrator <br />City of Arden Hills <br />4364 West Round Lake Road <br />AIden Hills, MN 55112 <br /> <br />RE: <br /> <br />200 1 Sanitary Sewer Rehabilitation Project <br />-Lift Station #8 Reconstruction <br />-Sanitary Sewer Tesl and Seal <br />-Sanilary Sewer Testing <br /> <br />Dear Mr, Lynch: <br /> <br />Bids were received and opened for the above-referenced project on January 3, 2001, Bids were received <br />from three (3) contractors. Jay Bros.. Inc, bid was not received at the Engineer's office by the submittal <br />deadline and therefore was returned unopened, The tabulated bid outcome is as follows: <br /> <br />1 <br />2 <br />3 <br />4 <br /> <br />Contractor <br />Gridor Construction, Inc, <br />Moorhead Construction Co" Inc <br />Larncui & Sons, Inc. <br />Jay Bros., Inc, <br /> <br />Base Bid Amount Bid All. #1 <br />$302.484,00 $56,920~00 <br />$313,521.00 $32,722,00 <br />$318,275.00 $30,500.00 <br />Returned Unopened <br /> <br />Bid Alt. il2 <br />$32,310,00 <br />$28.810,00 <br />$27,050,00 <br /> <br />All bids had proper bid guarantees in the amount often percent (10%) of the total bid as required by the <br />Project Manual. A bid tabulation was performed to verify the total bid amounts and all bids were found to <br />be correc[. A copy oHhe bid tabulation is attached for your information, <br /> <br />This project includes two bid alternatives, which all bidders were required to complete, Bid alternative #1 <br />included open trench sewer spot repairs in the Ingerson Road. Shoreline Lane and Lake Lane <br />neighborhoods, Bid alternative #2 included sewer cleaning and televising in the area bound by 1-694, Old <br />Highway 10 and Chatham Avenue, <br /> <br />Thresher Squaro <br />700 Third Street Sout! <br />Minneapolis, MN 5541, <br />612.370,0700 T, <br />612,370,1378 Fa <br />
The URL can be used to link to this page
Your browser does not support the video tag.