Laserfiche WebLink
<br />{ <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />JAN-04-2001 17:20 <br /> <br />BRW <br /> <br />512 373 5525 <br /> <br />P.03/\d3 <br /> <br />URS <br /> <br />SRW, Inc, <br /> <br />Mr, Joe Lynch <br />January 4, 200 1 <br />Page 3 <br /> <br />reconstruction of lift station #8 the Engineer recommends that Bid Alternative #2 not be included with this <br />project and be bid as a separate project at a later date. <br /> <br />Recommendation <br />Although The Engineer does not have any direct experience with the low bidder, Gridor Constl1lction, Inc" <br />the contractor has supplied the Engineer with a resume and an extensive list of references for projects of <br />this nature, The Engineer has checked with references and is confident thai Gridor Construction is capable <br />of successfully completing this project. <br /> <br />The City Engineer, therefore, recommends the award of the Base Bid for the 2001 Sanitary Sewer <br />Rehabilitation Project to Gridor Construction, Inc., for lhe total base bid amount of $302.484,00, Both Bid <br />Alternatives from all Contractors were higher than estimated based on previous cost of projects with the <br />same elements, Therefore the City Engineer recommends not awarding Bid Alternative #1 or Bid <br />Alternative #2, The project schedule outlined below is based upon award by the City Council On January <br />9.2001. <br /> <br />A ward Contract <br />Begin Construction <br />Complete Construction <br />Complete Landscape/cleanup <br /> <br />January 9, 200] <br />January 22. 2001 <br />May 25. 2001 <br />May 25, 2001 <br /> <br />Please call me at (612) 373-6479 if you have any questions or need addirional information, <br /> <br />Sincerely, <br /> <br /> <br />,/~ <br /> <br />attachment <br />co: Dwayne Stafford/Arden Hills <br />Terry Post/Arden Hills <br />Nick Landwer/BRW <br />Mark LynchIBRW <br />,Frank Ticknor/BRW <br />File 37951-016-0101 <br /> <br />B/SIREc:.lIf"" <br /> <br />TOTAL P,03 <br />