My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-20-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 02-20-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:30 PM
Creation date
11/13/2006 2:36:09 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Mr, Joe Lynch <br />Februal)' 9, 200 I <br />Page 3 of 3 <br /> <br />Sllmmal)' of Current Fee RerJllestor; <br /> <br />At this time we are requesting the following fees and fee adjustments: <br /> <br />t. Rebid Fee <br /> <br />2. Additional Construction Administration Fee <br /> <br />$8,t2S <br />$14,t64 <br /> <br />. <br /> <br />Potential Additional Fee Requests <br /> <br />As you are aware, there have been many proposed scope changes to the project since bids were taken. These <br /> <br />changes include the potential inclusion of an office for the National Guard, a server room, change of room <br /> <br />finishes in the community room, modifications to the front counter, and the potential enclosure of an office <br /> <br />space on second floor. Whereas these scope change do not appear to be maior items, they do take time to <br /> <br />design, administer, meet about, issue proposal requests to the contractor, etc, It is not the practice of <br /> <br />Architectural Alliance to "nickel and dime" our clients for incidental client requested scope changes which <br /> <br />are made during the course of a construction process. However, we must respect the potential requests from <br /> <br />our consultants for scope changes and will forward those to you as we go through the process, I have also <br /> <br />requested of our staff that they keep track of the time associated with these scope changes, because the time <br /> <br />equates to fee that we can not bill for, and, thus, provides added value for the City, <br /> <br />We vel)' much appreciate your consideration in this matter. Please call me if you have any questions, <br /> <br />Thank You! <br /> <br />Sincerely, <br /> <br />f4wtU <br /> <br /> <br />PETER VESTERHOLT, AlA <br />Principal <br /> <br />. <br /> <br />cc: Ellsworth <br /> Elliott <br /> Sterner <br /> Cooper <br /> Dowell <br /> File <br /> <br />H:IHQ PROJECTSI199711997149101IiceI020901L1.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.