Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />2.4 Signal Timing <br /> <br />Ramsey County Highway Department supplied information regarding the traffic signal <br />operation at the intersection of County Road E and Lexington Ave. County Road E at <br />Lexington Ave operates in coordination with four other signal systems to the north on <br />Lexington Ave. Since the other intersections in the system were not included in this <br />Traffic Study, the cycle length used was not optimized for each scenario, instead the <br />current a.m. and p.m. peak hour cycle length of 110 seconds was held constant. <br />However, the intersection turning movement splits were optimized for each scenario to <br />best serve the critical movements. <br /> <br />Walgreen's Traffic Impact Study <br />Draft Report <br /> <br />. Existing Conditions <br />February 07, 2001 <br /> <br />2-2 <br /> <br />ribl <br />138 <br />