Laserfiche WebLink
<br />I <br /> <br />~ <br /> <br />I <br /> <br />TABLE 4-1 <br /> <br />OBJECTIVES, POLICIES, AND OVERAlL MANAGEMENT STRATEGIES <br />(Continued) <br /> <br />C.4 Policy: <br /> <br />To nlinhni'T.e runoff velocities and m~yjtni'T.e natural <br />coverin orderthat erosion be reduced. <br /> <br />I <br />I <br /> <br />Manae-ement Strate"" <br /> <br />a. In the absence of an approved and implemented local water <br />management plan, the developer will provide the following on-site <br />treatment measures in both new development and redevelopment: <br /> <br />I <br />I <br />I <br />II <br />I <br /> <br />1) Minimize slopes. <br /> <br />2) Provide stabilized channels for stormwater runoff. <br /> <br />3) Incorporate energy dissipaters into stormwater management <br />features on-site if appropriate. <br /> <br />4) Encourage use of natural grass waterways 1n discharge <br />stormwater runoff from sites and to promote natural treatment <br />for stormwater runoff. <br /> <br />b. The local water management plan must be consistent with, but not <br />necessarily limited to, the four aforementioned items. <br /> <br />C.5 Policy: <br /> <br />To provide all measures necessary 10 contain <br />sediment and control erosion within construction <br />sites. <br /> <br />I <br />I <br />I <br /> <br />Manal!ement Strate"" <br /> <br />a. In the absence of an approved and implemented local water <br />management plan, developer will provide the following on-site <br />treatment measures in both new development and redevelopment of <br />residential areas greater than 5.0 acres or industrial/commercial <br />areas over 2.5 acres. <br /> <br />1) <br /> <br />Provide and maintain <br />measures on construction <br />transported off-site. <br /> <br />erosion and sediment control <br />sites where sediment could be <br /> <br />I <br />I <br /> <br />2) <br /> <br />Utilize phased construction <br />minimize disturbance of <br />construction. <br /> <br />techniques, if appropriate, In <br />vegetation on-site during <br /> <br /> <br />3) Require scheduling and implementation of temporary cover <br />establishment over all construction site areas that are <br />. disturbed if the implementation of final cover establishment <br />. measures is delayed. <br /> <br />I <br /> <br />4-11 <br /> <br />10/97 <br />