Laserfiche WebLink
<br />which will require water quality ponding measures to treat water prior to discharging to the <br />lake. <br /> <br />Subwatershed 14d: Valentine Lake <br /> <br />Policies: <br /> <br />A.3, B.1, B.2, B.3, B.4, B.5, C.l, C.2, C.3, C.4, C.5, E.1, E.2, E.3, E.5, and F <br /> <br />Valentine Lake receives runoff from a 2.4 sq mi area which includes Highways 694, 51, and <br /> <br /> <br />10. Runoff rate control will be required due to the high density of development occurring in <br /> <br /> <br />this subwatershed. The lake receives significant amounts of untreated runoff from the <br /> <br /> <br />County Ditch 12 system although the ditch itself has been stabilized as part of the Long Lake <br /> <br /> <br />Chain of Lakes program. Numerous smaller ponds have been established within the <br /> <br /> <br />Highway 51/694 right-of-way and the Land O'Lakes corporate headquarters. Valentine Lake <br /> <br /> <br />is monitored by the Ramsey County Department of Public Works and will be the subject of <br /> <br /> <br />District inflow monitoring to diagnose sources of highest loadings. <br /> <br />Subwatershed 14e: E2 Wetland <br /> <br />Policies: <br /> <br />A.3, B.l, B.2, B.3, B.4, B.5, C.l, C.2, C.3, C.4, C.5, D.I, D.2, E.l, E.2, E.3, <br />E.5, and F <br /> <br />This subwatershed was comprised of a large restored wetland complex located southeast of <br /> <br />I-35W and 1-694. The subwatershed is hydraulically overloaded. An adjustable outlet <br /> <br /> <br />structure is used to moderate level fluctuations and capture initial spring runoff for <br /> <br /> <br />treatment in the wetland area. Beaver activity in both subwatersheds 14d and 14e has <br /> <br /> <br />resulted in unacceptable water level fluctuations in recent years. Detailed hydrologic <br /> <br /> <br />modeling was performed under the Lake Johanna watershed study and extended over all <br /> <br /> <br />subwatershed 14 areas. <br /> <br />Subwatershed 15a: Jones Lake <br /> <br />Policies: <br /> <br />A.3, B.1, B.2, B.3, B.4, B.5, C.1, C.2, C.3, C.4, C.5, E.l, E.2, E.3, E.5, and F <br /> <br />This area drains approximately 3.61 sq mi. Drainage through subwatersheds 15a and 15b <br />was documented in the Pike Lake watershed study completed prior to initiation of the Long <br />Lake Chain of Lakes Grant Program. The District performed project work to increase <br /> <br />4-24 <br /> <br />10/97 <br /> <br />I <br />J <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />I <br />