My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-20-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 08-20-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:39 PM
Creation date
11/13/2006 2:36:31 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RULE D <br />EROSION CONTROL PLANS <br /> <br />1. POLICY. It is the policy of the Board of Managers to prevent <br />erosion of soil into surface water systems by requiring preparation <br />and implementation of erosion control plans for land disturbance <br />activities. <br /> <br />2. REGULATION. A permit and an erosion control plan is required <br />for new development, redevelopment, or additions to an existing <br />site. <br /> <br />3. DESIGN CRITERIA FOR EROSION CONTROL PLANS. <br />Plans must comply with the following criteria: <br /> <br />Erosion Control <br /> <br />(a) Natural site topography and soil conditions must be <br />considered to reduce erosion and sedimentation during <br />construction and after project completion. <br /> <br />(b) Site erosion and sediment control practices must be <br />consistent with recommendations of the Best Management <br />Practices identified in the Minnesota pollution Control <br />Agency's "Protecting Water Quality in Urban Areas," and <br />be sufficient to retain sediment on-site. <br /> <br />(c) Erosion and sediment control measures must be <br />installed prior to land altering activities and routinely <br />inspected and maintained by permittee during the project <br />until final turf and ground cover is established as <br />documented in "Protecting Water Quality in Urban Areas" <br />(MPCA, 1989). Permittee will inspect project sites after <br />every rainfall event exceeding 0.5 inches and implement <br />erosion and sediment control measures addressed as <br />needed. The project must be phased as best possible to <br />minimize disturbed areas and removal of existing <br />vegetation until necessary for proj ect progress. In <br />order to ensure that sediment is retained on-site, the <br />District Inspector may require the permit applicant to <br />provide additional erosion control measures where site <br />conditions warrant. <br /> <br />(d) Silt fences will be removed after all disturbed <br />areas have been permanently stabilized. <br /> <br />4. REQUIRED EXHIBITS. The following exhibits must accompany the <br />permit application. One set, full size; two sets, reduced to <br />maximum size of 11"x17." <br /> <br />(a) An existing and proposed topographic map which <br />clearly indicates all hydrologic features and areas where <br />grading will expose soils to erosive conditions. The <br />plan must also indicate the direction of all site runoff. <br /> <br />17 <br /> <br />I <br /> <br />,. <br /> <br />J <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.