My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-20-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 08-20-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:39 PM
Creation date
11/13/2006 2:36:31 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />I <br /> <br />8.15.01 <br /> <br />Planning-level estimates of eapital expenditures has been made. Future <br />anticipated projects are also listed. The activities have been distributed <br />throughout a lO-year implementation plan extending though 201 L <br /> <br />The Capital Improvement Plan is summarized in Table 5. <br /> <br />Table 6 <br />Capital Improvement Plan <br /> <br /> Preliminary <br />Project Project Description Project Cost Date(s) of <br />Location Description Estimate Implementation Comments <br />Feasibility study Preliminary engineering and $43,000 1 Cost does not include <br />for Pond P-? design surveying of ponds in <br /> drainage system <br />Feasibility study Preliminary engineering and $19,000 1 Cost does not include <br />for Pond P-8 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $19,000 1 Cost does not include <br />for Pond P-l0 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $19,000 1 Cost does not include <br />for Pond P-ll design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $31,000 1 Cost does not include <br />for Pond P-12 design surveying of ponds in <br /> drainage system <br />Feasibility study Preliminary engineering and $33,000 2 Cost does not include <br />for Pond P-2 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $43,000 2 Cost does not include <br />for Pond P-3 design surveying of ponds in <br /> drainage system <br />Feasibility study Preliminary engineering and $43,000 2 Cost does not inelude <br />for Pond P-4 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $31,000 3 Cost does not include <br />for Pond P-5 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $24,000 3 Cost does not include <br />for Pond P-6 design surveying of ponds in <br /> drainage system <br /> <br />City of Arden Hills, Minnesota <br />Local Water Resource Management Plan <br /> <br />A-ARDENOt01.00 <br />Page 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.