Laserfiche WebLink
<br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />I <br /> <br />8.15.01 <br /> <br />Planning-level estimates of eapital expenditures has been made. Future <br />anticipated projects are also listed. The activities have been distributed <br />throughout a lO-year implementation plan extending though 201 L <br /> <br />The Capital Improvement Plan is summarized in Table 5. <br /> <br />Table 6 <br />Capital Improvement Plan <br /> <br /> Preliminary <br />Project Project Description Project Cost Date(s) of <br />Location Description Estimate Implementation Comments <br />Feasibility study Preliminary engineering and $43,000 1 Cost does not include <br />for Pond P-? design surveying of ponds in <br /> drainage system <br />Feasibility study Preliminary engineering and $19,000 1 Cost does not include <br />for Pond P-8 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $19,000 1 Cost does not include <br />for Pond P-l0 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $19,000 1 Cost does not include <br />for Pond P-ll design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $31,000 1 Cost does not include <br />for Pond P-12 design surveying of ponds in <br /> drainage system <br />Feasibility study Preliminary engineering and $33,000 2 Cost does not include <br />for Pond P-2 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $43,000 2 Cost does not include <br />for Pond P-3 design surveying of ponds in <br /> drainage system <br />Feasibility study Preliminary engineering and $43,000 2 Cost does not inelude <br />for Pond P-4 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $31,000 3 Cost does not include <br />for Pond P-5 design surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and $24,000 3 Cost does not include <br />for Pond P-6 design surveying of ponds in <br /> drainage system <br /> <br />City of Arden Hills, Minnesota <br />Local Water Resource Management Plan <br /> <br />A-ARDENOt01.00 <br />Page 37 <br />