My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-20-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 08-20-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:39 PM
Creation date
11/13/2006 2:36:31 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />I <br /> <br />8.15.01 <br /> <br />The Implementation Plan is not a hard and fast commitment to eomplete each <br />and every activity in the time frame suggested. Rather, it is a suggested course <br />of action that will aecomplish the major goal of this plan, to aeeommodate <br />growth in the eommunity while protecting the environment. <br /> <br />The Capital Improvement Plan was developed based on RCWD's Tier <br />classifieations for the lakes in Arden Hills. The scheduling of these projects <br />should be coordinated with the City's Pavement Management Program <br />(PMP), which was also ereated prioritizing the neighborhoods around the Tier <br />2 lakes. <br /> <br />The east estimate for the construction of the proposed ponds does not include <br />land acqnisition or easement acquisition. The eost also does not take into <br />account if a feasible study will be completed. The cost does inelude the larger <br />construetion items such as excavation and restoration, and engineering and <br />administrative costs. The final project cost may change based on the <br />determination of scope of work. <br /> <br />Table 6 includes annual operating and maintenance costs, which are separate <br />from capital expenditures. <br /> <br />Table 7 <br /> <br />Annual Operating Costs <br /> <br />Project Project Preliminary Date(s) of Comments <br />Location Description Project Cost Implementation <br /> Estimate <br />Public Updating and managing web page. $10,000 Annual <br />Education and distribution of newsletter <br />Maintenance of Annual maintenance of ponds and $40,000 Annual <br />Ponds and ditches, including dredging when <br />Ditches necessary <br />Street Sweeping the streets twiee a year $30,000 Annual Assumes City labor <br />Sweeping and equipment, no <br /> eontract sweeping. <br /> <br />The Implementation Plan should be reviewed on an annual basis. At that time, <br />each proposed improvement is to be reeonsidered, City budgets adjusted, and <br />additional improvements added to the program. <br /> <br />Cost/Benefit for Pollutant Removal <br />(PENDING) <br /> <br />City of Arden Hills, Minnesota <br />Local Water Resource Management Plan <br /> <br />A-ARDEN0101.00 <br />Page 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.