Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />- <br /> <br />- <br /> <br />" <br /> <br />: <br /> <br />'" <br /> <br />.. <br /> <br />determine the area of steel remaining. However to be abso- <br />lutelY sure that no rusting is taking place, each tower leg <br />would have to be tested every square inch, which is not <br />economically feasible. <br /> <br />We are not implying that you do have rusting problems in the <br />subject tower, we are simply stating that we cannot guaran- <br />tee that no rusting is taking place and you should be aware <br />of this. Our, st:r:es" rat1qs as shown J,11 our analysis and in <br />the, results section of this report are based on steel " being <br />iJr~"iiew'c:ond1tion with no rusting or deterioration. <br /> <br />Upon request Ehresmann Engineering Inc. will visit the <br />previously described tower site and inspect tower,' lines, <br />and antennas for compliance to this engineering analysiS in <br />its entirety upon completion of project. Cost will be <br />quoted at time of request. <br /> <br />We would like to ,point out the fact tha! we considered ,this <br />tow/3:r to,be, in near new, cotldiponwhenC:Qmpleting our struc- <br />tural'analysis .,.~o"a~'J,.-Q~atie~{'waii"Diadef,or missing, con:od- <br />ing9f, deteriorating tower'members. <br /> <br />This report is based on the following: <br /> <br />1. Tower properly installed and maintained. <br />2. All members in good condition. <br />3. All members in place. <br />4. All bolts in place and properly tightened. <br />5. Weep holes on tube and pipe members open. <br />6. Tower being in plumb condition with proper guy tension <br />ins talled. <br />7. All tower members being properly designed, detailed, <br />fabricated, installed and maintained over the years. <br /> <br />Ehresmann Engineering Inc. is not responsible for <br />fications completed prior to or hereafter which <br />Engineering Inc. is not or was not directly <br />Modifications to include but are not limited to: <br /> <br />1. Replacing or strengthening bracing members. <br />2. Reinforcing vertical members in any manner. <br />3. Adding or relocating stabilizers. <br />4. Installing antenna mounting gates or side arms. <br />5. Changing guy sizes and related hardware. <br />6. Installing new anchors and anchor shafts. <br />7. Extending tower. <br /> <br />any modi- <br />Ehresmann <br />involved. <br /> <br />Ehresmann Engineering, Inc., hereby states that this docu- <br />ment ,represents the entire report and that it assumes no <br /> <br />4 <br />