My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-24-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 09-24-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:45 PM
Creation date
11/13/2006 2:37:07 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />Mounds View High School <br />Items to be Completed <br />Before Student Occupation of Building <br />Dated: September 8, 2001 <br /> <br /> 1. <br /> 2. <br /> 3. <br /> 4. <br /> 5. <br /> 6. <br /> 7. <br /> 8. <br /> 9. <br />. 10. <br /> 11. <br /> 12. <br /> <br />13. <br />14. <br />15. <br />16. <br />17. <br />18. <br />19. <br />20. <br />. <br /> <br />Faculty bathrooms <br /> <br />Water leakage Room 251 <br /> <br />Fencing around materials, construction debris - areas not to be occupied <br /> <br />Sidewalks entrances, exits to code <br /> <br />rlvllC h I,<;-f deiY~ <br />U r. 'I Jtf-e f;;oy" <br />..-f-(, \.:: IlK <br />S+V)tll-K 15 (XC,! <br /> <br />Barrier around entry stairs and sidewalks at east wing <br /> <br />All construction material minimum 6 feet from roof edge <br /> <br />All exits need to be clear of debris at cafeteria <br /> <br />All construction material to be isolated behind fencing <br /> <br />Exit at library needs to have steps-handrail and panic hardware <br /> <br />Temporary classrooms in cafeteria to have steps, handrail, and exit door <br /> <br />Roofing material to be secure and watertight (all areas) <br /> <br />Exits out of Door #1 0 or Wrestling Gym Door to be clear of all construction <br />material and have a clearly marked exit route (marked) <br /> <br />Exit out of wood shop to be clear of all construction debris <br /> <br />Dumpster removed from front of exit at rear doors next to gas main <br /> <br />Additional hanger-support added to main gasline at centerline of wall <br /> <br />Exit #3 to have construction debris from roof removed <br /> <br />Front drive at west wing to be accessible-lip at concrete curb maximum y," <br /> <br />Enclose entire perimeter of front entry addition <br /> <br />Entry light pole bases to be secured-covered <br /> <br />West and east wing stair enclosed at north end needs to be firestopped, doors, <br />panic hardware, closers - 1 hour construction <br /> <br />21. Room 212 door to new addition to be secured <br /> <br />Page 1 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.