Laserfiche WebLink
<br /> 5EP-19-2001 15:09 BRW 612 373 6526 P.04/17 <br />Application for Payment: Itemization <br />Schedule: A - LIFT STATION RECONSTRUCTION . <br /> Unll Contract Contract To-Dllte To-Dete <br />No, Ilem Unit Prlee Quantity Amount QuantJry Amount <br />1 M081l1ZATION LS 55.000,00 1.00 55,000.00 1.00 55,000.00 <br />2011.501 <br />~ LIFT STATION REMOVALS LS SM.OOO.OO 1.00 $30.000,00 1.00 530,000.00 <br />2103.501 <br />3 REMOVE SEWER PIPE 110' elP) LF S10,OO 26.00 S2BO,00 2B.00 S260.00 <br />2100i1.501 <br />4 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SY $3,00 180.00 S540,00 1 BO.OO $S40.00 <br />2104.601 <br />S BITUMINOUS DRIVEWAY PAVEMENT P') Sy $30.00 lBO.OO $MOO,Oo 105,00 $3.1S0.00 <br />2350.521 <br />6 LIFT STATION STRUCTURAL CONCRETE LS 540,000,00 1.00 $40.000.00 1.00 $40,000.00 <br />2411,603 <br />7 DEWATERING LS $2,000.00 '.00 52.000.00 1.00 52,000.00 <br />2.SUIOl <br />8 REBUILD WEST WELL INVERT lS $300.00 1.00 5300,00 1.00 S300,00 <br />2503,502 <br />9 FITTINGS LB $1.00 900.00 $900.00 7,319,00 $7,319.00 <br />2'503.603 <br />10 10' CIP FORCEMAIN LF 560.00 17,00 $1,020.00 17.00 51.020.00 <br />~50UC3 <br />l' SEWER BYPASS LS $15,000.00 1,00 515,000,00 1.00 $15.000.00 <br />2503.603 <br />12 6' CIP FORCEMAIN IF $100.00 10.00 51.000,00 10.00 51,000.00 <br />200;U03 . <br />13 6' FLANGE GATE VALVE EA 5400.00 3.00 $1,200.00 3,00 51.200.00 <br />2503.500 <br />14 3' STEEL VENT PIPE EA 5150.00 2,00 5300.00 2.00 5300,00 <br />2503,003 <br />15 CONNECT TO EXISTING SANITARY FORCEMAIN EA S5.00000 1.00 S5.000,00 1.00 $S,OOO.OO <br />2503.603 <br />18 UFT STATION PUMP SYSTEM LS 534.450,00 1,00 534,450,00 1.00 $34,450.00 <br />2$03.t03 <br />17 LIFT ST AnON elECTRICAL SYSTEM lS 530,000.00 1.00 $30.000.00 1.00 S30,000.00 <br />26031.603 <br />18 6' SWING f,E~ CHECK VALVE EA 5600.00 3.00 $2,400.00 3.00 52.400.00 <br />2'503.603 <br />19 10' FlANGE GATE V/>J..VE EA 51,000.00 2.00 52,000,00 2.00 S2.000.00 <br />2503.61l3 <br />20 50' PRECAST METER MANHOLE WITH CASTING lS 55,000.00 1,00 55.000,00 1.00 S5,OOO,00 <br />2~OU02 <br />21 CONSTRUCTION FENCE LF 53.00 3$0,00 51.050.00 100.00 S300,00 <br />2573.502 <br />22 SilT FENCE TYPE HEAVY DUTY LF $200 160.00 $360,00 0.00 SO.OO <br />2513.502 <br />23 SITE GRADING lS 5300.00 1,00 $300,00 1.00 $300,00 <br />2575.1502 <br />24 SOD wrrn 4. TOPSOil SY 53.00 140.00 5420.00 460.00 51,360.00 <br />2575.50l <br />25 INSTAll fO' MCES MAG METER EA S800.00 1.00 S6oo,00 3,]2 $2,976.00 <br />0000,000 . <br /> Subtotal: 5184.700.00 S19o,695.00 <br /> Page 3 0' 5 <br />