My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-17-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 09-17-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:46 PM
Creation date
11/13/2006 2:37:13 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />", .... <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />determine the area of steel remaining. However to be abso- <br />lutelY sure that no rusting is taking place, each tower leg <br />would have to be tested every square inch, which is not <br />economically feasible. <br /> <br />We are not implying that you do have rusting problems in the <br />subject tower, we are simply stating that we cannot guaran- <br />tee that no rusting is taking place and you should be aware <br />of this. Ourstrefis rati.t:l.s as, shown1n our analysis and in) <br />(the, resultssecfion'of thi~ reportar~bued an steel " being <br />i~~~~ew condition with no rusting or deterioration. <br /> <br />Upon request Ehresmann Engineering Inc. will visit the <br />previously described tower site and inspect tower, lines, <br />and antennas for compliance to this engineering analysis in <br />its entirety upon completion of project. Cost will be <br />quoted at time of request. <br /> <br />We would like to,point out the fact that we considered this <br />towel' to be in neatnewcClJ)dftion:when completing our' s,truc- <br />turalanalysis ..!'Io.a:,lfp.:waricewas made for missing, corrod- <br />ing6'# deteriorating tower members. <br /> <br />This report is based on the following: <br /> <br />1. Tower properly installed and maintained. <br />2. All members in good condition. <br />3. All members in place. <br />4. All bolts in place and properly tightened. <br />5. Weep holes on tube and pipe members open. <br />6. Tower being in plumb condition with proper guy tension <br />installed. <br />7. All tower members being properlY designed, detailed, <br />fabricated, installed and maintained over the years. <br /> <br />Ehresmann Engineering Inc. is not responsible for <br />fications completed prior to or hereafter which <br />Engineering Inc. is not or was not directly <br />Modifications to include but are not limited to: <br /> <br />any modi- <br />Ehresmann <br />involved. <br /> <br />1. Replacing or strengthening bracing members. <br />2. Reinforcing vertical members in any manner. <br />3. Adding or relocating stabilizers. <br />4. Installing antenna mounting gates or side arms. <br />5. Changing guy sizes and related hardware. <br />6. Installing new anchors and anchor shafts. <br />7. Extending tower. <br /> <br />Ehresmann Engineering, Inc., hereby states that this docu- <br />ment represents the entire report and that it assumes no <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.