Laserfiche WebLink
<br />Attachment B: Planning Commission Meetin!! Excerpt <br /> <br />Mr. Cronin explained if the applicant so chose, they may accept the comments of the City Council <br />and make formal application for a Master PUD, followed by a Final PUD before construction <br />occurs on the site. <br /> <br />. <br /> <br />Mr. Cronin stated special requirements for the Gateway Business District were outlined in Section <br />5 (M) of the Zoning Ordinance. <br /> <br />Mr. Cronin reviewed the allowable use by explaining in the Gateway Business District, "office" <br />was a permitted principal use. Section 5 (M) #3 outlines specific requirements for the District for <br />allowable uses. There was a stipulation by this Section that states that office uses cannot occupy <br />less than 25% or more than 50% of a project's total floor area. The Welsh Developments along <br />Gateway Boulevard were limited in their office component to 20% (warehouse for the remaining <br />area) so that more office use could be accommodated on the prominent corner property (1-694 & <br />1-35W). A Master PUD for that property, proposing 100% office build-out, was approved earlier <br />this year. This proposal also proposed 100% office, 50% above the maximum permitted in the G- <br />B District. <br /> <br />Mr. Cronin stated a 750-foot antenna tower was also proposed as a use on this property. The <br />antenna was not accessory to the office use on the property. It was considered a principal use <br />since it did not support or in any way related to the office use on the property. Section 6 (I) #2 <br />stated that antennas were allowed only, "...on property containing a principal use to which the <br />antenna, dish antenna or tower is accessory". Therefore, the proposed antenna was not a <br />permitted principal use in the G-B District. <br /> <br />Mr. Cronin presented the Development Standards, structure height, by explaining the District <br />Requirements Chart of the Zoning Ordinance stated a maximum structure height of 35 feet for the <br />District. However, Section 5 (M) #5 (b) contradicts this by stating that, "multi-story buildings will be <br />encouraged", "the use of stepped buildings in encouraged" and "the location of buildings relative <br />to their heights will consider views" within the Gateway Business District. The intent of the District <br />was to promote high quality, large-scale development and take full advantage of the site's <br />location. The proposed height of the two office buildings was 56 feet each, exceeding the 35-foot <br />maximum for the District. The proposed antenna was 750 feet in height where only a maximum of <br />75 feet was permitted, if it was accessory to the primary use on the property. <br /> <br />. <br /> <br />Mr. Cronin presented the structure setbacks by stating the building setback requirements for the <br />District were as follows: 50 feet from streets and exterior property lines; 20 feet from side and rear <br />property lines. The front yard was defined as the part of the lot that abuts a street. The proposed <br />bisects the site although the property lines did not. The proposed office buildings meet the <br />setback requirements from both the proposed street and 1-694, as shown on the plans. The <br />proposed accessory structure below the antenna did not meet the Ordinance requirements since <br />it had been placed in the front yard of the lot. Front yards in this proposal were considered that <br />property which abuts the proposed street (on both the North and South side) and the property <br />abutting 1-694. Any accessory structures on this property would have to be located in the side <br />yard of the office buildings. <br /> <br />Mr. Cronin presented the structure exteriors by explaining the Zoning Ordinance required that <br />exterior wall surfaces in the GB District be brick, stone, glass or any combination of these. The <br />exterior materials proposed for the office buildings and accessory structure are pre-finished <br />aluminum, brick and glass. Pre-finished aluminum was not a material permitted by the Zoning <br />Ordinance. The applicant had supplied plans and elevations of the proposed office buildings. <br />Although the accessory structure had been described in the narrative, there were no plans <br />showing it in elevation, which have been submitted. <br /> <br />Mr. Cronin summarized the traffic study stating the traffic study for the District was completed by <br />BRW in 1998, analyzing potential development and still keeping Highway 96 and Round Lake <br />Road within design capacity. SEH completed another traffic study in 2000, analyzing BRW's <br />study and taking into consideration the potential development by Chesapeake Companies in the <br /> <br />. <br />