My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-14-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 11-14-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:50 PM
Creation date
11/13/2006 2:37:42 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ROM.:HALLJNG ENGINEERING <br />, <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />FAX NO. ;9524513310 <br /> <br />Dec. 05 2001 03:04PM Pi <br /> <br />~allinfj . <br />~ (ff;-;nf/i1tCet:infj <br /> <br />3727 255th Street E. . Webster MN 55088 . Phone (952) 461 -3320. Fax (952) 461 -3310 <br /> <br />MEMO <br /> <br />To: Nick Landwer, PE <br />Aaroll Parrish, Arden Hills City Planner <br /> <br />From: Gregory R. Halling, PF. ~t.* <br /> <br />Date: December 1, 2001 <br /> <br />Re: Co Rd j) & Cleveland Ave. Site Plan, Blair Propel1ies Plan Review November 29, 2001 <br /> <br />This memo responds 10 the items brought up in the plan review by Nick Ll1ldwer. <br /> <br />.1: <br /> <br />Attached are calculations and a copy of the to po showing the property as it was <br />previously developed. The~e calculations show that the existing storm sewer is 'ldequute <br />to handle this developmcnl. Additional spot elevations on the Cleveland entrance will <br />ensure that surface water is directed to the spillway. Also the driveway has a negligible <br />amount of runoff going directly to COlUlty Road D. <br /> <br />2. Attached is a lette!' from the Rice Creek WSD showing that no permit i.s l'eqLlired. <br /> <br />3. Utility details will be added to the final plans when a building permit is ilppJied j()r and <br />thc details which have been requested frOm Niek wiJJ be placed on the plans. <br /> <br />4. Retaining wall~ will be finalized on the final plans and railings will be shown. <br /> <br />5. Final details with a S\lmp pump draining the exterior ramp at the lower level \ViII direct <br />the runoff to the swale on the north. <br /> <br />6. The ramp on the east side of the building will nO! be used by tbe public and will only be' <br />used occasionully by the owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.