My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-13-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 11-13-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:51 PM
Creation date
11/13/2006 2:37:43 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />B. <br /> <br />All other uses shall be subject to the floodwaylf1ood fringe evaluation <br />criteria set forth in this code. <br /> <br />e <br /> <br />Subd. 2. Procedures for Floodwav and Flood Frinl!e Determinations Within the <br />General Flood Plain District <br /> <br />A. Upon receipt of an application for a Speciai Use Permit for a use within <br />the General Flood Plain District, the applicant shall be required to furnish <br />the following information as is deemed necessary by the City <br />Administrator for the determination of the Regulatory Flood Protection <br />Elevation and whether the proposed use is within the Floodway or Flood <br />Fringe District. <br /> <br />I. A typical valley cross-section showing the channel of the stream, <br />elevation of land areas adjoining each side of the channel, cross- <br />sectional areas to be occupied by the proposed development, and <br />high water information; and <br /> <br />2. Plan (surface view) showing elevations or contours of the ground; <br />pertinent structure, fill, or storage elevations; size, location, and <br />spatial arrangement of all proposed and existing structures on the <br />site; location and proposed and existing structures on the site; <br />location and elevations of streets; photographs showing existing <br />land uses and vegetation upstream and downstream; and soil type; _ <br />and .. <br /> <br />3. Profile showing the slope of the bottom of the channel or flow line <br />of the stream for at least 500 feet in either direction from the <br />proposed development. <br /> <br />B. The applicant shall be responsible to submit one copy of the above <br />information to a designated engineer or other expert person or agency for <br />technical assistance in determining whether the proposed use is in the <br />Floodway or Flood Fringe District and to determine the Regulatory Flood <br />Protection Elevation. Procedures consistent with Minnesota Regulations <br />1983, Parts 6120.5000-6120.6200 shall be followed in this expert <br />evaluation. The designated engineer or expert is strongly encouraged to <br />discuss the proposed technical evaluation methodology with the respective <br />Department of Natural Resources' Area Hydrologist prior to commencing <br />the analyst. The designated engineer or expert shall: <br /> <br />1. Estimate the peak discharge of the regional flood. <br /> <br />2, Calculate the water surface profile of the regional flood based upon <br />a hydraulic analysis ofthe stream channel and overbank areas. <br /> <br />3. <br /> <br />Compute the floodway necessary to conveyor store the regional <br />flood without increasing flood stages more than 0.5 foot. A lesser <br /> <br />e <br /> <br />Ordinance 331 <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.