Laserfiche WebLink
<br />City Hall Rochon Corporation Contract - Proposed Change Order No.6 <br />December 14, 2001 <br />Page 2 <br /> <br />. <br /> <br />Item # Description Amount <br />8 Additional materials for PR#25 time and materials 96.00 <br />9 Straw bale checks for erosion control as instructed by BR W 556.00 <br />(Misc. Cost #26) <br />10 Provide 6Y:z" threshold at entrance doorframe to meet walk off 154.00 <br />mat (Misc. Cost #27) <br />11 Additional carpet and base at basement Corridor Room Bll, 1,889.00 <br />Stair B13, and Vestibule Room 131 (Misc. Cost #28) <br />12 Move switch in Kitchen Room B12 as requested by the City 314.00 <br />(Misc. Cost #31) <br />13 Wire dishwasher in Kitchen B-21 (Misc. Cost #32) 433.00 <br />14 Additional emergency lighting as requested by Dave Scherbel 1,061.00 <br />(Misc. Cost #33) <br />15 Furnish and install carpet over terrazzo at stairs 114 and B 1 0 as 2,310.00 <br />requested by City (Misc. Cost #34) <br />16 Vinyl base at Lobby 101, Waiting 103, Alcove 109, Corridor 505.00 <br />113 as requested by City (Misc. Cost #35 Revised) <br />17 Metal flashing at retaining wall to building per architects 434.00 <br />drawings (Misc. Cost #36) <br />18 Furnish aluminum angle at sills for cleaner finished look (Misc. 1,665.00 <br />Cost #38) <br />19 Furnish and install additional sod and irrigation by monument 2,709.00 <br />sign per City request (Misc. Cost #41) <br />20 Additional EIFS outside Council Chambers (in addition to PR- 641.00 <br />30) (Misc. Cost #43) <br /> <br />tit <br /> <br />Total: <br /> <br />$20,672.00 <br /> <br />Recommendation <br />Staff has reviewed, participated in discussions with the architect and contractor, and found the <br />content of Change Order No.6 to be reasonable as a contract increase with the contractor. <br /> <br />Issues with the architect notwithstanding, staff recommends that the Arden Hills City Council <br />approve Change Order NO.6 with Rochon Corporation in the amount of $20,672.00. The <br />approval of Change Order No.6 would increase the total contract cost to $3,102,201.93. <br /> <br />. <br />