My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-17-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 12-17-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:53 PM
Creation date
11/13/2006 2:37:54 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />. <br /> <br />. <br /> <br /> CITY OF ARDEN HILLS <br /> 2002 BUDGET PROCESS <br />FIVE YEAR CAPITAlo IMPROVEMENT PLAN <br />DEPARTMENT PROJECT TITLE PROJECT NUMBER FIVE-YEAR COST <br />Parks Replacement of the $55,000 <br /> warming house at <br /> Freeway Park <br /> SCHEDULED PROJECT ACTIVITY <br />FUNDING SOURCE 2002 2003 2004 2005 2006 FUTURE <br /> X <br />LOCATION Freeway Park, Upper Level, 1370 West County Road E <br />DESCRIPTION <br />Replacement of the warming house and improvement ofthe grade around the warming house. <br />JUSTIFICATION <br />The warming house is 27 years old. It is showing its age, The roofleaks, fascia, and soffits are <br />rotted as well as the floor. The front step and threshold have been replaced twice in three years, <br />Because of a poor location and grade, heavy rains and the spring thaw will produce standing <br />water around and inside the structure, <br />CURRENT STATUS/PROJECTED SCHEDULE <br />Listed as a top priority of the PTRC for action in 2002. <br />RELATIONSHIP TO EXISTING PLANS AND OTHER PROGRAMS <br />The PTRC, in the Park Compo Plan process which was a resident driven process, determined that <br />Freeway Park will continue to have a warming house. Furthermore, the PTRC made the <br />determination that basic and necessary repair or replacement of existing Park structures should <br />not be the focus of the Park Comp Plan, but rather should be the focus of an existing regular, <br />systematic replacement plan such as the Five-Year Capital Improvement Plan. The PTRC <br />believes that the replacement of the warming house is a basic and necessary action to take in <br />order to provide a safe and functional environment for the residents of Arden Hills. On two <br />separate occasions the PTRC unanimously voted to recommend that this project be placed in the <br />2002 CIP, <br />
The URL can be used to link to this page
Your browser does not support the video tag.