My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-08-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 07-08-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:56 PM
Creation date
11/13/2006 4:01:52 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Memorandum <br />July 2, 2002 <br />Page 2 <br /> <br />The project also includes the replacement of approximately 1300 feet of8 inch diameterwatermain <br />located along Old Highway 10 between Lake Valentine Road and County Road E-2. The new <br />watermain will be plastic in lieu of cast iron and should not cxperience the same degradation that <br />thc cast iron has experienced in this part of the City. The project includes directional boring of the <br />watermain across Lake Valentine Road and County Road E-2 to minimize disruption to the <br />travelling public. The project also includes a water service to Valentine Park for potential future <br />fountains and restrooms. The watermain is locatcd parallel to and approximately 10 feet apart from <br />an existing 12" and 10" diameter sanitary sewer trunk main. The sanitary sewer trunk main was <br />televised several years ago and consists of clay pipe in fair to poor condition. The project includes <br />the lining of the sanitary sewer adjacent to the watermain in order to protect the sanitary sewer from <br />damage during the replacement of the watermain (adjacent excavation), and to extend the life of the <br />pipe by at least fifty years and greatly reduce infiltration of groundwater into the system. The <br />Engineer's Estimate for this portion of work is $155,000. <br /> <br />The total estimated construction cost for the 2002 Sanitary Sewer and Watermain Improvements is <br />$255,000. There was no planned budget for this rehabilitation work. The Sewer Utility Fund #602 <br />currently has a balance of approximately $1,650,000. The Water Utility Fund #601 currently has a <br />balancc of$I,500,000. <br /> <br />2002 Drainaee Improvements <br />The project includes improvements at Perry Park along an existing slope to address a severe erosion <br />condition which may ultimately threaten playing ficlds. The work includes constructing a wide rip <br />rap lined swale. The Engineer's Estimate for this portion of work is $39,000. <br /> <br />The project also includes improvements at the south end of Karth Lake in Cummings Park. The <br />work includes removing silt from existing settlement ponds, slope stabilization, rip rap placement <br />and possible trail reconstruction. The Engineer's Estimate for this portion of the work is $20,000. <br /> <br />The total estimated construction cost for the 2002 Drainage Improvements is $59,000. <br />The budgeted amount for these improvements is $100,000. The Surface Water Management Utility <br />Fund currently has a balancc of approximately $530,000. <br /> <br />Recommendation <br />The City Engineer recommends that the Council approve the final plans and specifications and <br />authorize the advertisement ofthe projects to receive bids. The following are the proposed project <br />schedules based upon Council approval July 8, 2002. <br /> <br />Bid Opening <br />Contract Award <br />Begin Construction <br />Complete Construction <br /> <br />August 6, 2002 <br />August 12, 2002 <br />August 19,2002 <br />October 11, 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.