My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-12-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 11-12-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:59 PM
Creation date
11/13/2006 4:02:07 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br /> <br />estimated to last 25-30 years, cost approximately $]4] ,000 and result in an assessment <br />of approximately 50% of the total cost. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />" <br />I <br /> <br />? The City Engineer requests Council to direct staff on the following regarding the <br />east,west segment of Pleasant Drive: <br /> <br />· Mill and Overlay or Full Reconstruction <br /> <br />. If Reconstruction: Street Width 28' or 32', Curb Type <br /> <br />c. <br /> <br />Proposed Drainage/Water Quality Improvements <br /> <br />The proposed improvements include the installation of three manhole sized stOlID water <br />treatment devices in Amb]e Drive to improve the quality of runoff entering Karth Lake, <br />The installation of these manholes will require a small area of removal and patching in <br />Amb]e Drive, The costs associated with pavement removal and patching in Amble <br />Drive are proposed to be funded out of the Storm Water Utility Fund since no street <br />work is required for Amble Drive, A diagram of a typical treatment manhole is included <br />in the Appendix for information, <br /> <br />Based upon comments from residents received at the public meetings and review of the <br />existing drainage system, we have determined that the existing drainage infrastructure is <br />adequate for the 10 year frequency design storm, A few individuals have indicated that <br />they have experienced water problems in backyards however after field review of the <br />situations we have determined that the problems are due to specific grading conditions <br />in yards and not solvable by modifications to the City storm sewer infrastructure, If the <br />Council elects to reconstruct Pleasant Drive, we would propose to include the addition <br />of a catch basin at the east end of the street to assist with collection of surface drainage <br />in that area, The estimated construction cost for the installation of the three water <br />quality manholes and the additional catch basin on Pleasant Drive is $] 28,400,00 <br /> <br />D. <br /> <br />Proposed Utility Improvements <br /> <br />With the exception of minor storm water drainage repairs, no other public utility work <br />is anticipated at this time, A meeting will be held with the private utility companies to <br />discuss the proposed project and this may result in private utility upgrades, Although <br />private utility upgrades/modifications may be done in conjunction with this proposed <br />project they would not be installed as part of this proposed project. <br /> <br />]5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.