Laserfiche WebLink
<br />I <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />It <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br /> <br />No, <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br /> <br />City of Arden Hills <br />2003 Street Reconstruction Program <br /> <br />PLEASANT DRIVE <br />NORTH-SOUTH SECTION <br />MILL AND OVERLAY, 800 FEET <br /> <br /> Unit <br />Item Unit Ouantity Price Extension <br />Mobilization LS 1.0 $ 2,000,00 $ 2,000,00 <br />Mill Bituminous Surface, 2" SY 2,510,0 $ 1.50 $ 3,800,00 <br />2" Bituminous Overlay SY 5,016,0 $ 6,00 $ 30,100,00 <br />Bituminous Spot Repair SY 100,0 $ 20,00 $ 2,000,00 <br />Spot Curb and Gutter Repair EA 80,0 $ 25,00 $ 2,000.00 <br />Traffic Control LS 0,05 $ 25,000,00 $ 1,300.00 <br />10% Contingency $ 4,100,00 <br />SUBTOTAL $ 45,300.00 <br />26% Indirect Cost and Capitalized Interest $ 11,800,00 <br /> <br />Total Estimated Project Cost" <br /> <br />$ <br /> <br />57,100.00 <br />