My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-12-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 11-12-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:59 PM
Creation date
11/13/2006 4:02:07 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memorandum, Replacement of the Three Water Meters that Monitor the Water Flow <br />From the City ofRoseville to the City of Arden Hills <br />Page 2 <br />. Date: November 6, 2002 <br /> <br />meters will be 8" ABB Mag meter Type S with grounding rings, ABB Logmaster enabled and <br />includes all necessary software. The new meters will be properly sized to fit our water lines, <br />which will allow us the ability to fill the South Water Tower for the first time since it was <br />constructed. <br /> <br />Since the South Water Tower regulates the water level in the North Water Tower, all of the <br />residents of the City of Arden Hills will benefit from the installation of three new 8" ABB Mag <br />meters. City staff should be able to provide a consistent water volume and flow rate on a year <br />round basis throughout the entire City. <br /> <br />Costs and Timeline <br />The cost of three 8" ABB Mag metcrs, including installation and set up, will be $25,000. The <br />cost for electrical and software installation will be $13,000. Final total cost for this project, <br />including sales tax, will be $38,000. Staff is recommending that the funds for this project come <br />out of the Water Utility Enterprise Fund. The current balance in this Fund as of September 30, <br />2002, was $523,515. <br /> <br />Installation will take ten working days. If approved tonight, work can begin the weck of <br />November 18, 2002. <br /> <br />. <br /> <br />Staff Recommendations <br />City Staff and the City of Roseville staff recommend the replacement of the three water meters <br />that monitor the water flow from the City of Roseville to the City of Arden Hills at a cost not to <br />exceed $38,000. Staff also recommends that the funds for this project come out of the Water <br />Utility Enterprise Fund. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.