My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-12-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 11-12-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:59 PM
Creation date
11/13/2006 4:02:07 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memo to Planning Commission <br />Planning Case #02-25: Preliminary Plat and Master Plan PUD <br />Page 6 of 12 <br /> <br />. <br /> <br />· Reconstructing "Cummings Park Drive" at Guidant's expense in accordance <br />with plans and specifications approved by the City Engineer, <br /> <br />The City currently has standards for street reconstruction. After an evaluation of <br />the private access drive by the City Engineer, it was determined that the pavement <br />condition index (PCI) was within the threshold for street reconstruction. As such, <br />prior to dedicating the street to the City, it will be necessary for it to be <br />reconstructed in conformance with plans and specifications approved by the City <br />Engineer. Based on discussions with Guidant, they are amenable to this. <br /> <br />To ensure that the above is appropriately accounted for and implemented, staff would <br />also recommend incorporating a condition requiring the execution of a development <br />agreement for developer installed public improvements. Finally, it will also be necessary <br />for Guidant to provide a perpetual access easement for the Xeel Energy Substation, Xcel <br />eurrently accesses the property from Fernwood on the south via an unimproved access <br />drive. Xce! also has lot frontage on County Road F. This agreement would essentially <br />allow them to maintain their existing access. <br /> <br />9. <br /> <br />Park Dedication, Since the properties were never previously platted and the Preliminary <br />Plat calls for the creation of 3 new parcels, park dedication is required. A condition is <br />included in the recommendation requiring Guidant to satisfy the park dedication <br />requirement as approved by the City Council. <br /> <br />. <br /> <br />Recommendation <br /> <br />In Planning Case #02-25A staff recommends approval ofthe preliminary plat with the following <br />conditions: <br /> <br />I. A trail easement being provided on the western portion of the property in conjunction <br />with the final platting of the property. <br />2. The installation of a traffic signal at thc intersection of "Cummings Park Drive" and <br />Lexington Avenue at Guidant's expense. <br />3. Reconstructing "Cummings Park Drivc" at Guidant's expense in accordance with plans <br />and specifications approved by the City Engineer. <br />4. Execution of a development agreement for developer installed public improvements. <br />5. Provision of an access easement to Xcel Energy. <br />6. Compliance with applicable provisions ofthe City Code and related ordinances. <br />7. Satisfaction of the park dedication requircment as approved by the City Council. <br /> <br />Options <br /> <br />1. <br />2. <br /> <br />Recommend approval as submitted. <br />Recommend approval with conditions. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.