Laserfiche WebLink
<br />Memo to Planning Commission <br />Planning Case #02-25: Preliminary Plat and Master Plan PUD <br />Page ]00f12 <br /> <br />. <br /> <br /> <br />Building G 35' 45' 60' <br />Building H 35' 60' 60' <br />Addition I 35' 45' 30' <br />Addition J 35' 45' 30' <br />Building K 35' 135' 135' <br />Building L 35' 45' 62' <br />Building M 35' 135' 75' <br />Building N 35' 105' 75' <br /> <br /> <br /> Ramp I Y2 35' 40' 40' <br /> Ramp 2 Y2 35' 50' 50' <br /> Ramp 3 1 35' 50' 30' <br /> Ramp 4 2 35' 80' 30' <br /> Ramp 5 2 35' 40' 40' . <br /> Ramp 6 2 35' 50' 40' <br /> Ramp 7 2 35' 80' 40' <br />8, Fire protection <br /> <br />The Lake Johanna Fire Inspector has stated that currently the Fire Department does not <br />have a small enough Fire Truck to navigate parking ramps in the event of a vehicle fire. <br />The applicant will need to work with the Lake Johanna Fire Department to make <br />provisions in the parking ramps for fire protection; sprinklers, standpipes, or a smaller <br />tanker fire truck. This would need to occur prior to parking ramps being constructed. <br /> <br />9. Traffic <br /> <br />Gencrally speaking, traffic has been identified as the primary issue of concern relative to <br />this proposal. As previously mentioned, a phasing plan the links building construction to <br />necessary traffic improvements has been developed. This is attached for your review. In <br />addition, staff has had contact on a number of occasions with the Ramsey County Traffic <br />Engineer relative to this proposal. He has indicated that he is in agreement with the <br />phasing approach. Aside from Cummings Park Drive, it is anticipated that necessary <br />road improvements would be completed in conjunction with the Ramsey County <br />Transportation Improvement Plan. <br /> <br />. <br />