My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-22-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 01-22-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:01 PM
Creation date
11/13/2006 4:02:40 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />" <br /> <br />" <br /> <br />EXA-"IPLE ONLY <br />NM 1-35W CORRIDOR COALITION <br />TRANSPORT A TION PROJECT SUMMARY <br /> <br />PROJECT: New bridge over I-35W <br /> <br />DATE: 12/06/01 <br /> <br />LOCATION: <br /> <br />North ofI-694 between Arden Hills and New Brighton <br /> <br />DESCRIPTION: This bridge will replace an existing railroad bridge no longer needed due <br />to rail line abandonment. The new bridge is needed to provide local mobility circulation and <br />reduce travel demand on the CR 96 interchange. Advance construction is needed to <br />accommodate NW Quadrant development activities and provide alternative travel route <br />during reconstruction of the CR 96 interchange in 2006. <br /> <br />COST: <br /> <br />$],800.991 <br /> <br />ESTIMATE BASIS: Initial Planning <br /> <br />CURRENT LETTING DATE: None NEEDED LETTING DATE: 2004 <br />STATUS: The need for this bridge emerged just recently from detailed assessment of <br />transportation system needs in the subregion. Accelerated schedule of planning and design <br />process is needed, along with funding assurance to meet the required letting schedule. <br /> <br />ACTIONS NEEDED: <br />1. Funding of planning and design work. <br />2. Acquisition ofRlW west of35W <br />3. Planning and programming approvals <br />4. Funding <br />5. Roadway connecting new bridge <br />to Old Snelling A venue <br /> <br />Est.Cost <br />$180,000 <br />$100,000 <br />o <br />$1,620,991 <br /> <br />Due Date <br />6/30/02 <br />12/30/03 <br />12/30/03 <br />3/26/04 <br /> <br />TBD <br /> <br />TBD <br /> <br />PRIMARY CONTACT: <br /> <br />/ <br />// <br /> <br />._~ <br /> <br />// <br /> <br />COALITION: <br />Joseph Strauss, Administrator <br />8525 Edinbrook Crossing, Suite #5 <br />Brooklyn Park, MN 55443 <br />763-493-5840 <br /> <br />/ <br />/. AGENCY: <br />, Nancy Daubenberger, Project Mgr. <br />! MN/DOT Metro Division <br />( Waters Edge <br />651-582-1379 <br /> <br />-'--... <br />~ <br /> <br />I FILENAME Ip I <br />
The URL can be used to link to this page
Your browser does not support the video tag.