My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-19-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 02-19-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:05 PM
Creation date
11/13/2006 4:03:04 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />!"""I"~ l <br />> " <br />> . <br />~-J-,. . ?<l <br /> <br />e ,,~ <br /> <br />Minnesota Department of Transportation <br /> <br />Metropolitan Division <br />Waters Edge <br />1500 West County Road 82 <br />Roseville, MN 55113 <br /> <br />2, E 2002 <br /> <br />January 17, 2002 <br /> <br />LS::iTY _._.--._.----_._._--~:~: <br /> <br />Mr. Aaron Parrish <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112-5794 <br /> <br />Subject: <br /> <br />Gateway Business Center -- MnJDOT Review File # EA W02-001 <br />Northeast Quadrant of Interstate 35W and Interstate 694 <br />Arden Hills, Ramsey County <br />Control Section 6284 <br /> <br />Dear Mr. Parrish: <br /> <br />e <br /> <br />Please be advised that the Minnesota Department of Transportation (MnJDOT) has reviewed the above <br />referenced Environmental Assessment Worksheet (EA W), Please address the following issues before any <br />further development: <br /> <br />. As stated in the attached March 30, 2001 letter (MnJDOT Review POI-031), the 1-35W /1-694 <br />interchange is scheduled to be reconstructed, along with the 1-694 expansion project, in December, <br />2007. This project is considering the removal of the loop in the northeast quadrant and replacing it <br />with fly overs, Although it is our intention to remain within MnJDOT right of way, there are no <br />defmitive limits of reconstruction for the interchange at this time. If you have any questions <br />regarding this information, please contact Nancy Daubenberger (651-582-1379) in Mn/DOT's Design <br />section. <br /> <br />. The Appendices listed in the EA W were not attached to the submitted document for review, For <br />verification of traffic operations as a result of the proposed development, please submit the <br />Sim5/Synchro Software results to Kevin Schwartz (651-582-1278) in MnJDOT's System Operations <br />section, <br /> <br />. The drainage issues affecting MnJDOT's right of way are unclear by the information provided in the <br />EA W, It appears that the ponds in the proposed project are outletting into MnlDOT's right of way, A <br />MnJDOT drainage permit will be required, The City or project developer will need to submit <br />before/after hydraulic computations for both 10 and 100 year rainfall events verifying that all existing <br />drainage patterns and systems affecting Mn/DOT right of way will be perpetuated, One foot of <br />freeboard is needed over the highwater elevation, Please direct questions concerning these issues to <br />Eric Kasa (651-634-2076) ofMnJDOT's Water Resources section, Questions regarding permit <br />applications should be directed to Keith VanWagner (651-582-1443) ofMnlDOT's Permits section, <br /> <br />e <br /> <br />Please address all future correspondence for development activity such as plats, site plans, environmental <br />reviews, and comprehensive plan amendments to: <br /> <br />An equal opportunity employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.