My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-29-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 04-29-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:10 PM
Creation date
11/13/2006 4:03:42 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />, <br />I. <br /> <br />",-', <br /> <br />~/m,.';-_ <br /> <br />(Attachment to Site Plan Review) <br /> <br />Project Description: <br /> <br />The Guidant CRM Training Facility is comprised of classrooms, laboratories, training <br />staff office space and operational support spaces. Included in the support functions are: <br />Dining facilities for trainees, break areas, material preparation space, central mechanical <br />and electrical spaces, storage and a shared receiving area with Building F. The facility <br />will provide a range of curriculums, developed by Guidant staff and consultants, intended <br />to enrich the myriad of Guidant CRM employees and customers. <br /> <br />The Guidant CRM Training Facility is being designed as a 3 level structure of <br />approximately 36,300 gross square feet per level, totaling approximately 110,960 gross <br />square feet It will connect to the southwest corner of Building F. The project includes a <br />major campus connection via a skyway link across Fernwood avenue to Building E. The <br />entrance lobby will face south and address an entry plaza that will eventually become <br />the "new front door" for the CRM campus. Also planned, as part of the project is a new <br />landscaped courtyard to the north of the facility. The facility and its outdoor amenities <br />will be designed as fully accessible spaces. <br /> <br />Initially, the program, as defined by Guidant Corp., will occupy 68,740 square feet of the <br />total 110,9600 square feet, occupying nearly two levels of the building. The third level <br />will be finished as "shell-space" and be reserved for future training curriculum expansion <br />and also provide interim swing space for ongoing departmental reorganizations. <br /> <br />Guidant Corporation <br /> <br />Training Facility <br />
The URL can be used to link to this page
Your browser does not support the video tag.