My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-29-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 04-29-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:10 PM
Creation date
11/13/2006 4:03:42 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />PPR- Q- 21302 15: 2E: <br /> <br />TKDP <br /> <br />ES12920883 <br /> <br />F,I3J <br /> <br />Mr, Terrance R. Post <br />City of Arden Hills <br />R~vi!ied Update Public Works/Parks Space Planning Study and Conceptual Master Plan <br />April 12,2002 <br />Page 3 <br /> <br />. <br /> <br />B. PART B - DEVELOP CONCEPTUAL MASTER FLOOR/SITE PLAN (in <br />conjunction with Ramsey County) <br /> <br />1, Inte2rate with Master Plan - We wi I) integrate the approved program <br />requirements for the City into the Conceptual Master Site and Facility Plan as it <br />relates to the facility Concept Plan for Ramsey County on the proposed 75-acre <br />site. The Anny National Guard will also occupy approximately 40 acres of the <br />proposed site and their proposed conceptual space will also be illustrated. <br /> <br />2, Cost Estimate - TKDA will prepare an opinion of probable construction costs <br />(based on square footage) for the OWNER'S respective pOllion of the Conceptual <br />Floor Plan/Site Plan. For those spaces that are physically shared, we will suggest <br />a probable cost-sharing ratio based on anticipated activity involvement. Other <br />areas that may be occasionally utilized by the OWNER (contract) but not <br />occupied (i.e" welding, wash bays, fueling, etc,) will be noted but not estimated <br />a~ part of the building cost. <br /> <br />3, <br /> <br />Study Prellaration - We will prepare a report documenting the program and <br />Conceptual Floor/Site Plans. including infonnation from the Ramsey County <br />Pre-Design Study as applicable to your Project, and joint usage of a combined <br />facility. <br /> <br />. <br /> <br />4. Final Presentation - We will present a draft of our findings to the OWNER'S <br />Task Force and upon final revisions and upon approvals, will prepare and furnish <br />ten copies of the finaI8-1/2"x I I" document. <br /> <br />III. ADDITIONAL SERVICES <br /> <br />If authorized by you, we will furnish or obtain from others Additional Services of the types listed <br />below which are not considered as basic services under Ihis Proposal. Additional Services shall <br />be billable on an Hourly Rate basis as defined in Article 3 of the General Provisions, and such <br />billings shall be over and above any maximum amounts set forth in this Proposal. <br /> <br />A. Any further meetings or evaluations requested by the OWNER. <br /> <br />B, Preparation of measured drawings of the OWNER'S exisling space, <br /> <br />c <br /> <br />Further design effort or documentation beyond lhat describe in SECTION II of this <br />Proposal. <br /> <br />. <br /> <br />D, <br /> <br />Renderings or 3D illustrations ofpolential facility images. <br />
The URL can be used to link to this page
Your browser does not support the video tag.