Laserfiche WebLink
<br />CIP Memorandum <br />May 15, 2002 <br />Page 2 <br /> <br />. <br /> <br />B. Watermain Utility <br />The following is a summary of the proposed watermain utility improvements included <br />with the 2003 CIP, <br /> <br />2003 Inspect South Water Tower: Conduct visual inspection of inside of South Water Tower to <br />determine whether interior coatings are effective, Estimated Cost $3,000. <br />Upgrade Booster Station: The booster station pumps and controls are original equipment <br />and require a fair amount of maintenance and upkeep. This improvement will reduce staff <br />maintenance time and provide a reliable pumping system for the next several decades. ' <br />Estimated Cost: $330,000 <br />Improvements associated with 2003 neighborhood reconstruction: $30,000 <br /> <br />C. Sanitary Sewer Utility <br />The following is a summary of the proposed sanitary sewer utility improvements included with <br />the 2003 CIP. <br /> <br />2003 Reconstruction of Lift Station #5 to upgrade pumping system and controls with <br />submersible pumps. Upgrade is expected to result in significant reduction of maintenance . <br />costs and operating electrical costs, Project similar to the Lift Station 8 upgrade <br />completed in 2001. <br />Estimated Cost: $200,000 <br />Repair/Reconstruction of 12" trunk line in Grey Fox area to eliminate sag in pipe. <br />Estimated Cost: $100,000 <br /> <br />D. Storm Water Utility <br /> <br />The proposed storm water utility improvements included with the 2003 CIP will include storm <br />sewer and ponding/water quality improvements constructed as a part of the Ingerson Road <br />neighborhood reconstruction project. <br /> <br />Estimated Cost: $380,000,00 <br /> <br />. <br />