Laserfiche WebLink
<br />2.11.02 <br /> <br />Planning-level estimates of capital expenditures has been made. Future <br />anticipated projects are also listed. The activities have been di~tribUled <br />throughout a 10-year implementation plan extending though 2011. <br /> <br />The Capital Improvement Plan (CIP) is summarized in Table 7. <br /> <br />-- <br /> <br />CD <br />::l <br />Co <br />>< <br />l> <br /> <br /> Preliminary <br />Project Project Cost Date(s} of <br />Location Project Description Estimaie Implementation Comments <br /> - <br />Evaluation of Evaluation of existing. water quality $60,000 2003-2004 <br />City's Water treatment for all subwatersheds <br />Quality Treatment <br />Feasibility Study Preliminary engineering and design $38,000 1 Cost does not include <br />for Pond P-7 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $14,000 1 Cost does not include <br />for Pond P-8 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $14,000 1 Co~t does not include <br />for Pond P-10 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $14,000 1 Cost does not include <br />for Pond P-11 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $26,000 1 Cost does not include <br />for Pond P-12 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $28,000 2 Cost does not include <br />for Pond P-2 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $38,000 2 Cost does not include <br />for Pond P-3 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $38,000 2 Cost does not include <br />for Pond P-4 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $26,000 3 Cost does not include <br />for Pond P-5 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $19,000 3 Cost does not include <br />for Pond P-6 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $33,000 3 Cost does not include <br />for Pond P-9 surveying of ponds in <br /> drainage system <br />Feasibility Study $288,000 <br />Subtotal <br /> <br />Table 7 <br />Capital Improvement Plan <br /> <br />:l> <br />"0 <br />"0 <br />CD <br />::l <br />Co <br />>< <br />OJ <br /> <br />l <br /> <br />.~ <br /> <br />, <br />> <br />( <br /> <br />. <br /> <br />A-ARDEN0101.00 <br />Page 43 <br /> <br />City of Arden Hills, Minnesota <br />Local Water Resource Management Plan <br /> <br />~ <br />